6.2.2 Automatic Blowback (External Blowback Control)
For automatic blowback, the shut-off valve in the probe with must have a pneumatic control (optional). The control unit for the
system is designed for sequential valve control, i.e.:
1.
Close the shut-off valve in the probe using the pneumatic control.
2.
Open the solenoid valve between the pressure vessel and probe for approx. 10 seconds.
3.
Open the shut-off valve in the probe.
Blowback can also be set as a closed process at intervals ranging from several minutes to hours or even days based on require-
ments.
6.3 Maintenance Schedule
NOTICE
When using the probe in explosive areas the maintenance schedule must be observed!
Maintenance schedule for normal ambient conditions:
Component
Interval in operating
hours
Work to be performed
To be performed by
Entire probe
every 8000 h
– Check gas connections
– Check safety devices and controllers
– Check electrical protective measures
– Working properly, dirt, visual inspection for dirt/
damage.
If damaged, replace or have repaired by Bühler.
Operator
Ball valves
every 8000 h
– Check ball valve function and check for leaks.
Operator
Filter
every 8,000 h
– Check dirt level of filter.
Operator
Seals
every 8,000 h
– Replace O-rings.
– Replace seals after every filter change.
Operator
Pressure vessel
every 8,000 h
– Drain condensate
Operator
Drive
1 x per year
– Replace seals, guides and lubricants.
Manufacturer
Entire probe
With respect to ball valve,
pneumatic and solenoid
valves
after 20,000 h or
3 years
– Inspection by Bühler
Service technician /
Bühler
Limit switch
after 5 years
– Replace seals on the shaft and the housing cover. Operator
19
Bühler Technologies GmbH
BE460048 ◦ 08/2019
Summary of Contents for GAS 222.21 Ex2
Page 4: ...GAS 222 21 Ex2 10 Attached Documents 29 ii Bühler Technologies GmbH BE460048 08 2019 ...
Page 27: ...GAS 222 21 Ex2 9 6 Dimensions 25 Bühler Technologies GmbH BE460048 08 2019 ...
Page 28: ...GAS 222 21 Ex2 26 Bühler Technologies GmbH BE460048 08 2019 ...
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 48: ...DE 461099 05 2016 Page 8 9 ...