7
Rail installation
SKR6.1R, SKR12.1R - Subject to technical modifications.
21
7.2
Installing horizontal rails and
clamps
Pre-assembly of lower clamping brackets on the
ground
B
Split the top and bottom clamping [2] and [1] at their
pre-determined breaking point.
B
Install the lower clamps [1] onto the bottom rail at the
distances indicated (
Æ
Fig. 29) and fit them using a
nut and a washer. Use a SW17 spanner.
Do not fasten the upper clamps [2] onto the collector and
the top rail until after the collector has been installed.
Installing the rails
When installing the rails, ensure they are aligned
accurately (dimension x: same overhang on the right and
left
Æ
Fig. 29).
Ensure that the hammer-head bolt is installed correctly
[4].
B
Using the L-shaped connector [5], 4 hammer-head
bolts, 4 washers and 4 nuts, install the horizontal rail [6]
onto the vertical rail [7].
Fig. 29 Rails and clips, all dimensions in mm
1
Lower clamp
2
Upper clamps
3
Horizontal rail 2007 mm
4
Hammer-head bolt (fitted)
5
L-shaped connector for connecting the rails
6
Horizontal rail
7
Vertical rail
Horizontal rails are not required in all cases
(
Æ
450-550
20-90
160-
260
1953
6720646203-19.2ST
5
7
6
90°
90°
1
2
1
450-550
20-90
90°
x
x
17
4
450-550
20-90
160-
260
450-550
20-90
160-
260
450-550
2007
1300
3