58
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
We reserve the right to make any changes due to technical modifications.
Boiler inspection and maintenance
16
Pilot burner opera-
tion continues even-
ly
Thermocouple monitors ignition flame, ignition flame generates voltage in
thermocouple and keeps ignition valve open.
Main burner operation
• thermocouple controls ignition flame.
• main gas solenoid valve opens.
Specified thermostat value (control) reached
Main valve closes, gas burner switches off. Ignition
flame is burning.
END
Start
Main burner
operating
Power interruption
System switches off. Does
the system restart when
power is restored?
Room thermostat (control) signals heat requirement
Vent damper opens.