56
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
We reserve the right to make any changes due to technical modifications.
Boiler inspection and maintenance
16
START
Room thermostat (control) signals heat requirement
Vent damper opens.
Ignition spark generator operates
• ignition gas valve opens.
Pilot flame stand by
• ignition spark generator stops.
• main gas solenoid valve opens.
Main burner operation
• automatic ignition monitors ignition flame.
Specified thermostat value (control) reached
Main and ignition gas valves close, gas burners ex-
tinguished, vent damper closes.
Ignition burner operation
Ignition flame burns, automatic
ignition signals steady ignition
flame.
or
ignition flame does not burn, au-
tomatic ignition starts ignition at-
tempt, switches off after 90
seconds.
END
PHASE 1
Ignition attempt
PHASE 2
Main burner
operating
Power interruption
System switches off. Does
the system restart when
power is restored?
Pilot flame fault
Main gas valve closes,
ignition module starts
ignition attempt.