6 | Operation
BÜCHI Labortechnik AG
26/70
Operation Manual Pure Chromatography Instrument C-805
Menu
Submenu / Action
Explanation
[Tools]
[Solvent Loading]
Assign a solvent to a solvent line.
See Chapter 5.6 "Assigning solvent to
solvent lines", page 20
[Solvent Definition]
Define solvents.
See Chapter 6.3 "Editing a solvent",
page 40
[Vapor Sensors and Limits]
Edit the vapor sensor sensitivity.
See Chapter 6.2.7 "Editing the vapor
sensor sensitivity", page 39
[Configuration]
System configurations.
[Calibration and Defaults]
Calibrate the screen.
Set time and date.
Reset UV lamp.
Set alarms
[Manual control]
Maintenance actions.
See Chapter 7.5 "Cleaning the instru-
ment", page 53
See Chapter 8.7 "Resetting the Fraction
collector arm", page 61
[NP<>RP]
Change back and forth between normal
phase and reverse phase
[Product Services]
Override max. pressure limit for car-
tridges.
[UV Baseline]
Adjust the baseline to zero during a run.
[Language]
Select a language.
[Service]
BUCHI service technicians only
[Help]
[About]
The display shows instrument details.
[View Manual]
The display shows the Operation man-
ual.