27
a
To pass cables to upside of ceiling, please, make
about 50~60mm hole on the ceiling panel.
&
'
DIRECT INSTALLATION ON THE CEILING
b
For cable connection, remove the pre-defined hole
mark on the Rubber Gasket and locate the summit of
the Plate Spring at the arrow mark as shown in the
dotted circle.
&
'
c
After assembling the Rubber Gasket to the Terminal
Cover, install Terminal Cover on ceiling tex and con-
nect cables to terminal blocks.
&
'
d
Connect the “Drop Prevention Spring” to the main
body to prevent camera from drop.
&
'
e
Check the 2 mold line for assembly before starting
assembly. Line up the mold lines as shown in the dot-
ted circle and turn main body on its axis in CW(Clock-
Wise) direction and assemble main body to Terminal
Cove
#
$
%
f
Tighten the Lockup Screw as shown bellow.
#
$
%
Summary of Contents for LE03110AA
Page 21: ...21 PACKAGE COMPONENT Product Accessories Optional...
Page 36: ......