![BTECH S5 BATTERY VALIDATION SYSTEM SCM-600 Operating Manual Download Page 18](http://html.mh-extra.com/html/btech/s5-battery-validation-system-scm-600/s5-battery-validation-system-scm-600_operating-manual_2824997018.webp)
18
S5 Battery Validation System
5
Make sure the load
current leads are
connected.
Make sure each LCL wire contains a fuse.
6
Make sure all plugs
are connected firmly.
Make sure each plug on the SCM-600, VM24, and CM-2 is inserted firmly and has all its wires
installed.
7
Make sure all wires
are intact.
Check all wiring for damage; replace if damage is found.
8
Make sure the CTs
are connected to the
CM-2s they were
configured with.
Compare the serial
number on each CT with
the serial number pasted
to the CM-2 it connects
to. They should match.
9
Make sure the CTs
are installed
correctly.
• Make sure both red dots on the CT are facing
the same way.
• Make sure the red dots are facing toward the
positive side of the power supply, so that the
current running through the CT goes from
positive to negative.
10
Make sure the
ambient thermistor
will provide an
accurate reading.
Make sure the thermistor attached to the SCM-600 is placed in a location that is the same
temperature as the air around the batteries.
11
Make sure the
batteries are stable.
Make sure the batteries have been unused for at least 72 hours before gathering data.
Action
How to do it
Picture
Serial number on CT
Matching serial number on CM-2