BTCPower 350 KW EVSE Installation manual
Draft
Page 16 of 23
a. 480 VAC 3 phase input and ground from the main power cabinet.
b. Communication conduit between the tower and the dispenser.
8. 9. Mounting procedures
Tools and ancillary equipment
1.
Philips head screw driver.
2.
QTY 4, ½” x 3-3/4” concrete expansion studs.
3.
½‘” torque wrench.
4.
Allen wrench set for electrical connections.
5.
Keys (shipped with unit), to be used to open the access panels.
Concrete pad installation requirements.
Use 4 (minimum 4) 1/2” x 3-3/4” (McMaster-Carr 91578A116 or equivalent) concrete expansion studs to anchor the
steel dispenser and cabinet with the BTCP EV Charging Station.
WARNING
BTCP EV Charging Station can only be installed onto undamaged concrete slab.
A minimum of 4 expansion bolts should be mounted on the bottom enclosure foot.
To install the expansion studs please follow the following steps:
Installation Steps
1.
Drill a hole at location specified. Clean hole thoroughly
PLEASE NOTE: Drill depth per manufacturer recommendation.
WARNING
If the drill length is less than specified, then bolt will bottom out prior to engaging the bottom installation footer
on the BTCP EV charging station. The system will be able to be rocked or moved.
2.
Insert the expansion bolt sleeve entirely in the hole without the fixture as shown in fig. 2 above.
3.
Position the fixture to be anchored, twist the expansion bolt until it is flush with the fixture. Place
enclosure.
4.
Tighten the expansion bolt to the specified installation torque.