background image

CoRe+

TM

 

Installation Guide 

Summary of Contents for CoRe+PSV2

Page 1: ...CoRe TM Installation Guide ...

Page 2: ...EVSE part alteration will automatically void the warranty Install the Communication Gateway prior to the Commissioning of the Station The Communication Gateway is the property of AddÉnergie Fees will be charged if the Gateway is damaged or lost IMPORTANT ELEMENTS TO CONSIDER WHEN INSTALLING THE COMMUNICATION GATEWAY An Outdoor installation is recommended The Customer must provide a waterproof PVC ...

Page 3: ...e Subject to Change Amendments and Additions at any Time Without Notice 3 V17 2016 03 03 Table of contents Introduction 4 Statement 5 Installation and Safety 6 Dimensions 7 Wall or Post Mounting 8 Closing the Housing of the Station 11 Preliminary Tests and Commissioning 12 Power Sharing 13 Typical Installation 13 ...

Page 4: ...dance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense The enclosed device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions i this device may not ...

Page 5: ... Output connector J 1772 compliant Split Phase 120 240 VAC Supply or 3 phase 120 208 VAC must be protected by a 40A breaker or fuse Maximum output current power CoRe V2 and CoRe VBV2 30A 7 2 kW 240V or 6 3 kW 208V CoRe PSV2 Dynamically controlled by a site controller between 8A and 30A between 1 7 kW et 7 2 kW Built in protection against overvoltage conditions and leakage current to ground Operati...

Page 6: ... rated for usage at a temperature of at least 75 C 6 This product must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or lead on the product and installed by a certified electrician 7 Communicate with a certified contractor certified electrician or trained install...

Page 7: ...and Specifications Contained in this Document are Subject to Change Amendments and Additions at any Time Without Notice V17 2016 03 03 Dimensions 154 cm 60 5 47 cm 18 5 33 cm 13 SOL GROUND 19 cm 7 5 14 cm 5 5 130 cm 51 125 9 5 cm 3 75 Patron de perçage Drilling pattern ...

Page 8: ...ng enough to reach the terminal block Connect two power conductors L1 and L2 and the ground conductor GND The grounding conductor shall be provided with green or green and yellow insulation Attach the head base to the wall or the post with appropriate type of anchors Hang the head base to an anchor previously fixed to the wall or post via the keyhole at the top NEVER REMOVE THE PROTECTION PLATE Co...

Page 9: ... the cable connector Replace the plate in place Install the cable connector to the punched hole then the cable Make sure the conductors are long enough to reach the terminal block Connect two power conductors L1 and L2 and the ground conductor GND The grounding conductor shall be provided with green or green and yellow insulation Attach the head base to the wall or the post with appropriate type o...

Page 10: ...pening in the wall or the post IMPORTANT never remove the protection plate of the keyhole Connect two power conductors L1 and L2 and the ground conductor GND The grounding conductor shall be provided with green or green and yellow insulation L1 L2 GND Attach the head base to the wall or the post with appropriate type of anchors Hang the head base to an anchor previously fixed to the wall or post v...

Page 11: ... to Change Amendments and Additions at any Time Without Notice V17 2016 03 03 Closing the Housing of the Station Connect the cables to their connectors Install the head to the base making sure that the seals stay in place then install the four mounting screws Install a o ring to the upper screw O ring Ground Data cable Output ...

Page 12: ... the reader detects the card it will emit an audible bip 2 Immediately after the bip the access card will be authenticated by the charging station 3 If the authentication of the card is successful the automated test of the protection circuit will be performed 4 Once the test is successfully completed the overhead status light will start flashing white 5 If the connector is inserted into an Electri...

Page 13: ...ut to 8A 3 To enable a dynamic sharing of current a site controller must be installed and properly configured by AddÉnergie 4 The site controller will then ensure that available maximum current is shared optimally amongst the charging stations between 8A and 30A for each station while making sure that the maximum circuit capacity 32A in the case of a circuit protected by a 40A breaker is never exc...

Page 14: ...ddenergie ca Installation or commissioning questions 877 505 2674 ext 203 AddÉnergie Technologies Inc Eastern office 2327 Versant Nord Boulevard office 120 Québec QC G1N 4C2 CANADA Central office 7420 Airport Road Mississauga ON L4T 4E5 CANADA Contact Us ...

Reviews: