2.2 Special Tools
Tools and ancillary equipment
1. Pedestal unit
2. Philips head screw driver
3. Back cover key
4. Qty 4, 3/8” x 2” concrete expansion bolts (For use with EVP – 1001-00)
5. Qty 5, ½” x 2” concrete expansion bolts (For use with EVP – 1001-10)
6. Qty 6 ¼” lag bolt (For use with EVP – 2001-00)
7. Qty 6 ¼” type A flat washer
8. 3/8 inch torque wrench
9. ¼ inch torque wrench
10. 3/16 inch Allen Wrench for electrical connections
11. Each EVSE station will require a dedicated 208/240 VAC single phase circuit for each
charging station to be installed. Example: a dual charging station will required two
independent circuits
12. Crimp Ferrules for connecting input lines.
13. Installation manual
2.3 EVP – XXX
Pedestal EVSE Installation Instructions
Fig. 1
EVP – 1001 – 00 Pedestal mounted EVSE
EVP-1001-01
EVP-1001-01
EVP-1001-02
This document is the
Property of Broadband Telecom Power
Inc.
and will not be copied, reproduced, or used as the basis
for sale or manufacture of apparatus without written
permission.
BTCPower EVP Series EVSE
Installation and Operations Manual
Rev C
Page 7 of 25