background image

Produd Assembly 

5. Piace the Bottom Metal Piece's between the joins

of the Rails with the triangular end pointing out

from the pool wall. 

(Diagram 19)

(Diagram 20) 

OUTSIDE OF 

POOL 

6. Piace the lnside Bottom Protector

aver the Steel Belt and screw

into the Horizontal Side Beam.

NOTE: 

Ensure the PVC

Sleeve covers the Steel

Belt to prevent damage or

rust effecting the pool.

(Diagram 20)

.... Leaf Skimmer

....

..... 

Cut Out 

.. 

•······ 

8. Rest the end of the pool wall in the Side Bottom 

Metal Piece between the gap in the Side Rail.  Make 

sure the prepared location is not prone to constant 

windy conditions.  Continue unrolling and placing the 

bottom edge of the pool wall into the rails until the full

length of the pool wall is sitting in the Rails 

(See Diagram 22) 

11 

·················-

(Diagram 19) 

�  CAUTION: Wear protective gloves

\ì,./ 

when handling the metal wall

7. Piace the Metal Pool Wall with the

Skimmer  Hole at the top, onto a 

piece of cardboard, ply wood or 

ground cloth to protect the leveled

ground during installation. 

NOTE:  Position the Pool Wall's 

Skimmer cutout in the same 

location to where your electricity

supply will be to power the 

filtration  system. 

(Diagram 21)

Seleding a Suitable Site 

9. On the opposite side of the

pool wall,  carefully lift and 

piace the steel wall

in between the Side 

Support Frame and the 

lnside Bottom Protector. 

NOTE! There is a section 

cut out of the pool wall that

will allow the wall to slot

over the Horizontal 

Support Beam.

(See Diagram 23) 

--

I� 

.... 

,, 

�� 

.. 

:� 

.. 

·•. 

�����:::;... 

...... 

··•··

·•·••

··

···•

..... . 

·········• 

.... 

-

-

-----------

1 O.  Line up the two ends of the pool wall then begin inserting and hand tightening each bolt

and nut until the full length of the join is assembled. 

(See Diagram 24) 

Do not

completely tighten bolts before you check the wall is in the correct piace, level 

and that no damage has occurred to the pool wall. 

... 

NOTE: At this stage, it is recommended that you assembla the 

..-�·-. 

���;:�•���;;:: 

;;:-:�:� �:!:

an 

IO g

a

;n 

a

ccess IO the 

(�t, ______ 

·(· '-··· ..... ·: 

------'"'----'"-'-'-----' 

........... 

.:

�-� (Diagram 2

4) ( 

... •···;······ ...

12 

Summary of Contents for Piscine London Plus

Page 1: ...LL a a _ Manuale di installazione Piscine LONDON PLUS...

Page 2: ...CHILDREN UNATTENDED WARNING RISK OF ELECTRIC SHOCK Connect Filter Pump only to a grounding type receptacle protected by an RCD Residuai Current Device Use a qualified electrician to install the RCD w...

Page 3: ...04 5 22001005 6 22001006 7 22001007 8 22001008 9 22001009 10 22001010 11 22001011 12 22001012 13 22001013 14 22001014 15 22001015 22001016 16 22001016 22001017 22001017 17 22001017 22001017 18 2200101...

Page 4: ...036 M8 NUT 37 22001037 ST6 3x19 SCREW 5 1 1 1 1 1 1 1 1 1 1 1 1 2 4 2 4 2 4 1 2 1 2 2 4 2 4 2 4 2 4 12 12 o o 8 8 o o o 4 o 32 32 1 1 8 8 8 8 8 8 2 4 6 o o 4 4 o o o 2 o o 8 8 8 8 2 4 73 89 57 57 65 7...

Page 5: ...s extremely important take as much time as possible to work out a site that is completely firm and levelled Use a carpenter s level and straight edge to ensure that the site is completely level flat a...

Page 6: ...e Vertical Side Beam to the Horizontal Side Beam POOL WALL SIDE FRAME SUPPORT ASSEMBLY 1 Connect the Steel Belt to either end of the Left and Right Side Pool Frames See diagram 13 and 14 Make sure the...

Page 7: ...etal Pool Wall with the Skimmer Hole at the top onto a piece of cardboard ply wood or ground cloth to protect the leveled ground during installation NOTE Position the Pool Wall s Skimmer cutout in the...

Page 8: ...ect the liner against the rail and the pool wall it is recommended to create a protective covering made of fine brick sand at the foot of the pool wall See diagram 29 30 The size should be 15cmH x 15c...

Page 9: ...verlap of the pool liner wall lf you cut the overlap it will make the next pool installation difficult Fix ali top rails to the top of the pool wall and make sure they are ali sitting properly INSTALL...

Page 10: ...i 1 O _ 2 1 ______ 1 _ I I __ 11 Diagram 37 f fe f fii o 11 1 t t o I i1 o 1 111 1 111 I r _ 1 2 6 AND 7 SIDE TOP PLATFORM AS SHOWN IN DIAGRAM 35 3 4 5 8 9 AND 10 TOP PLATFORM AS SHOWN IN DIAGRAM 36 A...

Page 11: ...and bolts I I I I I VERTICAL SUPPORT I I SIDE BOTTOM AND VERTICAL BEAM CONECTION Check for loose connections and tighten screws and bolts BOTTOM AND SIDE ANGLE BEAM CONNECTION Check for damaged suppr...

Page 12: ...nsanitary water is a serious health hazard 2 Maintain pool pH level between 7 2 to 7 6 3 Ask your dealers advice first if you want to modify your filtration system 4 Clean the PVC liner regularly with...

Reviews: