background image

Pool Wall Side Frame Support Assembly 

The Pool Wall Side Frame Support consists of a left and right frame connected by a stainless steel belt. 

(See diagram 8) 

(Diagram 8) 

Outside of 

Pool 

Left Frame 

Right Frame 

Joint Protector 

Stainless Steel Belt 

------•t..::..=....:r=

================

t::::::::;,l==��=::::i 

(Diagram 9) 

1. Connect the side Side Bottom

Joint Protector to the top

of the Vertical Side Beam 

Angled

Side 

Beam 

Horizontal Side 

Beam 

(Diagram 11) 

3.

Connect the lower end of the

Angled Side Beam to the

Horizontal Side Beam

..., ______ .. 

,,

Connect both 

Side Bottom 

Metal Piece A 

and B to the 

Horizontal 

Side Beam 

' ' ' 

r----------

Vertical 

Side 

Beam 

,.. ....... "\� .............. .. 

---

SIDEBOTTOM 

METAL PIECE A 

(Diagram1 O) 

2.

Connect the Angled Side

Beam to the Vertical Side

Beam

4.

Connect the lower end of the

Vertical Side Beam to the

Horizontal Side Beam

POOL WALL SIDE FRAME SUPPORT ASSEMBLY 

1. Connect the Steel Belt to either end of the Left and Right Side Pool Frames. 

(See diagram 13 and 14)

Make sure the Steel Belt is protected by the PVC Sleeve which is provided in the package. This

will protect the Pool Liner from damage.

Left Frame 

(Diagram 13) 

POOL WALL RAIL AND RAIL CONNECTOR SETUP 

Right Frame 

(Diagram 14 ) 

1. Position the Left and Right Side Wall Frame in the middle of the prepared area 

(See diagram 15)

2. Piace the Rails around the area where the pool wall is to be installed. 

(See diagram 15)

3. Connect the Rails together using 2 Rail Connectors per Rail 

(See diagram16 ) 

and leave a

1.5cm gap between each connection 

(See diagram 

17).

4. Connect the Side Rails to the Side Bottom Metal Piece A and B either side of the Pool Wall Frame Supports

(See diagram 18)

;:::::=======-=-=-=--=--=--=---=---=---=----=-----�- - - --

� -------;:::::========.;:;;:::::=,:;==;;=====� 

�1.5cm� 

(0.6") 

- -
- -

(Diagram 16) 

- -

(Diagram 17) 

:::,�)'"-

"' 

·····•., .............

... .

(Diagram 18) 

10 

Summary of Contents for Piscine London Plus

Page 1: ...LL a a _ Manuale di installazione Piscine LONDON PLUS...

Page 2: ...CHILDREN UNATTENDED WARNING RISK OF ELECTRIC SHOCK Connect Filter Pump only to a grounding type receptacle protected by an RCD Residuai Current Device Use a qualified electrician to install the RCD w...

Page 3: ...04 5 22001005 6 22001006 7 22001007 8 22001008 9 22001009 10 22001010 11 22001011 12 22001012 13 22001013 14 22001014 15 22001015 22001016 16 22001016 22001017 22001017 17 22001017 22001017 18 2200101...

Page 4: ...036 M8 NUT 37 22001037 ST6 3x19 SCREW 5 1 1 1 1 1 1 1 1 1 1 1 1 2 4 2 4 2 4 1 2 1 2 2 4 2 4 2 4 2 4 12 12 o o 8 8 o o o 4 o 32 32 1 1 8 8 8 8 8 8 2 4 6 o o 4 4 o o o 2 o o 8 8 8 8 2 4 73 89 57 57 65 7...

Page 5: ...s extremely important take as much time as possible to work out a site that is completely firm and levelled Use a carpenter s level and straight edge to ensure that the site is completely level flat a...

Page 6: ...e Vertical Side Beam to the Horizontal Side Beam POOL WALL SIDE FRAME SUPPORT ASSEMBLY 1 Connect the Steel Belt to either end of the Left and Right Side Pool Frames See diagram 13 and 14 Make sure the...

Page 7: ...etal Pool Wall with the Skimmer Hole at the top onto a piece of cardboard ply wood or ground cloth to protect the leveled ground during installation NOTE Position the Pool Wall s Skimmer cutout in the...

Page 8: ...ect the liner against the rail and the pool wall it is recommended to create a protective covering made of fine brick sand at the foot of the pool wall See diagram 29 30 The size should be 15cmH x 15c...

Page 9: ...verlap of the pool liner wall lf you cut the overlap it will make the next pool installation difficult Fix ali top rails to the top of the pool wall and make sure they are ali sitting properly INSTALL...

Page 10: ...i 1 O _ 2 1 ______ 1 _ I I __ 11 Diagram 37 f fe f fii o 11 1 t t o I i1 o 1 111 1 111 I r _ 1 2 6 AND 7 SIDE TOP PLATFORM AS SHOWN IN DIAGRAM 35 3 4 5 8 9 AND 10 TOP PLATFORM AS SHOWN IN DIAGRAM 36 A...

Page 11: ...and bolts I I I I I VERTICAL SUPPORT I I SIDE BOTTOM AND VERTICAL BEAM CONECTION Check for loose connections and tighten screws and bolts BOTTOM AND SIDE ANGLE BEAM CONNECTION Check for damaged suppr...

Page 12: ...nsanitary water is a serious health hazard 2 Maintain pool pH level between 7 2 to 7 6 3 Ask your dealers advice first if you want to modify your filtration system 4 Clean the PVC liner regularly with...

Reviews: