800SA/801SA: Installation, Start–Up, Operating and Service and Maintenance Instructions

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

34

A05025

Fig. 48 – Igniter Position-Side View

NOTE: 

The materials needed in item 9 can usually be purchased

 

at local

hardware stores.

 

9. Using a field-provided 25-caliber rifle cleaning brush; a 36-in. (914

mm) long, 1/4” (6 mm) diameter steel spring cable; and a variable

speed, reversible electric drill; and a vacuum cleaner, clean cells as

follows:

a. Remove metal screw fitting from wire brush to allow insertion 

into cable.

b. Insert the twisted wire end of brush into end of spring cable, and 

crimp tight with crimping tool or crimp by striking with 

ball-peen hammer. TIGHTNESS IS VERY IMPORTANT.

(1.) Attach variable-speed, reversible drill to the end of

 

spring 

cable (end opposite brush).

 

(2.) Insert brush end of cable into the outlet opening of cell

 

and 

slowly rotate with drill. DO NOT force cable.

 

Gradually 

insert cable into upper pass of cell (see 

Fig. 49

).

A91252

Fig. 49 – Cleaning Heat Exchanger Cell

(3.) Work cable in and out of cell 3 or 4 times to obtain

 

sufficient cleaning. DO NOT pull cable with great

 

force. 

Reverse drill and gradually work cable out.

(4.) Insert brush end of cable in burner inlet opening of

 

cell, and 

proceed to clean 2 lower passes of cell in

 

same manner as 

upper pass.

(5.) Repeat foregoing procedures until each cell in furnace

 

has 

been cleaned.

(6.) Using vacuum cleaner, remove residue from each cell.

(7.) Using vacuum cleaner with soft brush attachment,

 

clean 

burner assembly.

(8.) Clean flame sensor with fine steel wool.

(9.) Install NOx baffles (if removed).

(10.)Reinstall burner assembly. Center burners in cell

 

openings.

10. Remove old sealant from cell panel and collector box flange.
11. Spray  releasing  agent  on  the  heat  exchanger  cell  panel  where

collector box assembly contacts cell panel.

 

NOTE: 

A releasing agent such as cooking spray or equivalent

 

(must not

contain  corn  or  canola  oil,  aromatic  or  halogenated

 

hydrocarbons  or

inadequate  seal  may  occur)  and  RTV  sealant

 

(G.E.  162,  6702,  or

Dow-Corning  738)  are  needed  before  starting  installation.  DO  NOT

substitute  any  other  type  of  RTV  sealant.  G.E.  162  (P771-9003)  is

available through RCD in 3-oz. tubes.

12. Apply new sealant to flange of collector box and attach to cell panel

using existing screws, making sure all screws are secure.

13. Reconnect  wires  to  the  following  components.  (Use  connection

diagram on wiring label, if wires were not marked for reconnection

locations.): 

a. Draft safeguard switch.

b. Inducer motor.

c. Pressure switch(es).

d. Limit over-temperature switch.

e. Gas valve.

f. Hot surface igniter.

g. Flame-sensing electrode.

h. Flame rollout switches.

i. Install NOx baffles (if removed).

14. Reinstall internal vent pipe, if applicable. 
15. Reinstall  vent  connector  on  furnace  vent  elbow.  Securely  fasten

vent  connector  to  vent  elbow  with  2  field-supplied,

corrosion-resistant, sheet metal screws located 180° apart.

16. Replace blower access door only, if it was removed.
17.   Set  thermostat  above  room  temperature  and  check  furnace  for

proper operation.

18. Verify  blower  airflow  and  speed  changes  between  heating  and

cooling.

19. Check for gas leaks.
20. Replace outer access door.

SEQUENCE OF OPERATION 

NOTE: 

Furnace  control  must  be  grounded  for  proper  operation  or

control  will  lock  out.  Control  is  grounded  through  green/yellow  wire

routed to gas valve and manifold bracket screw. 
Using the schematic diagram, follow the sequence of operation through

the different modes. Read and follow the wiring diagram very carefully. 

NOTE: 

If a power interruption occurs during a call for heat (W), the

control  will  start  a  90-sec  blower-only  ON  period  two  seconds  after

power is restored, if the thermostat is still calling for gas heating. The

amber LED light will flash code 12 during the 90-sec period, after which

the LED will be ON continuous, as long as no faults are detected. After

the 90-sec period, the furnace will respond to the thermostat normally. 
The blower door must be installed for power to be conducted through the

blower  door  interlock  switch  ILK  to  the  furnace  control  CPU,

transformer  TRAN,  inducer  motor  IDM,  blower  motor  BLWM,

hot-surface igniter HSI, and gas valve GV. 

9/32”

7.1mm

5/16”

7.9mm

WARNING

!

FIRE OR EXPLOSION HAZARD

Failure  to  follow  this  warning  could  result  in  personal  injury,  death

and/or property damage. 

Never purge a gas line into a combustion chamber.  Never test for gas

leaks with an open flame. Use a commercially available soap solution

made specifically for the detection of leaks to check all connections.

Summary of Contents for 800SA

Page 1: ...r Hour 21 EXTERIOR MASONRY CHIMNEY FAN NAT INSTALLATIONS WITH TYPE B DOUBLE WALL VENT CONNECTORS NFPA AGA 22 VENTING NOTES FOR Fig 31 Fig 43 25 START UP ADJUSTMENT AND SAFETY CHECK 25 GENERAL 25 Table...

Page 2: ...residential garage must be installed as specified in the warning box in the Location section 9 The furnace may be used for construction heat provided that the furnace installation and operation compli...

Page 3: ...tion in a Garage CODES AND STANDARDS Follow all national and local codes and standards in addition to these instructions The installation must comply with regulations of the serving gas supplier local...

Page 4: ...tic discharge can affect electronic components Follow the Electrostatic Discharge Precautions Procedure listed below during furnace installation and servicing to protect the furnace electronic control...

Page 5: ...a volume of at least 50 cubic feet per 1 000 Btuh input rating for all gas appliances installed in the space Spaces having less than 50 cubic feet per 1 000 Btuh require the OUTDOOR COMBUSTION AIR MET...

Page 6: ...ns from the current edition of National Fuel Gas Code ANSI Z223 1 NFPA 54 1 For other than fan assisted appliances such as a draft hood equipped water heater A04002 1 SQ IN PER 4000 BTUH DUCTS TO OUTD...

Page 7: ...and dilution of flue gases However in buildings with unusually tight construction additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section 4 Unusually...

Page 8: ...Table 3 and Fig 9 3 Construct plenum to dimensions specified see Table 3 and Fig 9 4 If downflow subbase KGASB is used install as shown see Table 10 If Coil Assembly Part No CNPV CNRV CAP and CNR or...

Page 9: ...red 11 13 16 284 19 483 13 7 16 341 20 5 8 600 Downflow Applications on Combustible Flooring with Cased Coil subbase not required 12 5 16 319 19 483 13 5 16 338 20 508 17 1 2 445 Upflow Applications o...

Page 10: ...revent screws from pulling out use 2 8 x 3 4 in 19 mm screws into the side and 2 8 x 3 4 in 19 mm screws in the bottom of the furnace casing for each strap see Fig 14 and Fig 15 If the screws are atta...

Page 11: ...0 ft 3 M of main duct to the first branch take off may require internal acoustical lining As an alternative fibrous ductwork may be used if constructed and installed in accordance with the latest edit...

Page 12: ...915 915 825 785 740 700 48070E21 Gray Cooling Do not use for heating 1735 1685 1640 1595 1545 1495 1450 1405 1360 1310 Yellow Alt Cooling or alt Heating 1480 1435 1395 1340 1290 1240 1190 1135 1085 10...

Page 13: ...side inlets a combination of 1 side and the bottom or the bottom only will ensure adequate return air openings for airflow requirements above 1800 CFM Fig 17 Dimensional Drawing 60110E24 Gray Cooling...

Page 14: ...of Massachusetts 1 Gas supply connections MUST be performed by a licensed plumber or gas fitter 2 When flexible connectors are used the maximum length shall not exceed 36 inches 915 mm 3 When lever h...

Page 15: ...NPT plugged tapping accessible for test gauge connection MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve WARNING FIRE OR EXP...

Page 16: ...electrical circuit with a properly sized fuse or circuit breaker for this furnace See Table 7 for wire size and fuse specifications A readily accessible means of electrical disconnect must be located...

Page 17: ...WITCH WHT BLK WHT BLK NOTES Connect Y terminal in furnace as shown for proper blower operation Some thermostats require a C terminal connection as shown If any of the original wire as supplied must be...

Page 18: ...es into electrical box 9 Remove cover from furnace J Box 10 Route field ground wire through holes in electrical box and casing and into furnace J Box 11 Reattach furnace J Box to furnace casing with s...

Page 19: ...board thermostat strip The HUM terminal is energized when the pressure switch closes during a call for heat see Fig 28 NOTE DO NOT connect furnace control HUM terminal to HUM humidifier terminal on Th...

Page 20: ...or condensation in the venting system These furnaces are approved for common venting and multistory venting with other fan assisted or draft hood equipped appliances in accordance with the NFGC the lo...

Page 21: ...appliances connected to the venting system are not in operation 1 Seal any unused openings in venting system 2 Inspect the venting system for proper size and horizontal pitch as required in the curre...

Page 22: ...on in the furnace and or venting system Derating is permitted only for altitudes above 2000 ft 610 M 3 Adjust the air temperature rise to the midpoint of the rise range or slightly above Low air tempe...

Page 23: ...the furnace being vented Follow all manufacturer s installation requirements for venting and termination included with the listed mechanical venter Caution For the following applications use the mini...

Page 24: ...lication Vent Elbow Left A03208 Fig 36 Upflow Application Vent Elbow Up A03212 Fig 37 Downflow Application Vent Elbow Up then Right A03218 Fig 38 Horizontal Right Application Vent Elbow Right SEE NOTE...

Page 25: ...Data Sheet for accessory listing 6 Factory authorized accessory Downflow Vent Guard Kit required in downflow installations with lower vent configuration See Product Data Sheet for accessory listing 7...

Page 26: ...ure will not operate if any thermostat signal is present at the control 4 Component test sequence is as follows see service label attached to furnace or Fig 44 a LED will display previous status code...

Page 27: ...fices See EXAMPLE 1 3 Adjust manifold pressure to obtain correct input rate a Turn gas valve ON OFF switch to OFF b Remove manifold pressure tap plug from gas valve see Fig 21 c Connect a water column...

Page 28: ...When thermometer readings stabilize subtract return air temperature from supply air temperature to determine air temperature rise NOTE If the temperature rise is outside this range first check 1 Gas i...

Page 29: ...Ammeter WARNING FURNACE OVERHEATING HAZARD Failure to follow this caution may result in reduced furnace life Recheck temperature rise It must be within limits specified on the rating plate Recommende...

Page 30: ...urn thermostat below room temperature or from HEAT to OFF and turn 115v power OFF then back ON 3 Check Pressure Switch This control proves operation of the draft inducer blower a Turn off 115 v power...

Page 31: ...S switch until LED goes out then reconnect it NOTE If wire to LS or DSS is disconnected longer than 4 sec main blower starts and status code is overwritten with a limit circuit 33 code 2 When above it...

Page 32: ...wheel as follows 1 Turn off electrical supply to furnace 2 Remove outer door 3 For downflow or horizontal furnaces having vent pipes within the furnace that pass in front of the blower access door a...

Page 33: ...eavy build up of soot and carbon indicates that a problem exists which needs to be corrected such as improper adjustment of manifold pressure insufficient or poor quality combustion air incorrect size...

Page 34: ...TV sealant G E 162 P771 9003 is available through RCD in 3 oz tubes 12 Apply new sealant to flange of collector box and attach to cell panel using existing screws making sure all screws are secure 13...

Page 35: ...zing the humidifier terminal HUM The inducer motor IDM will remain energized for a 5 second post purge period The blower motor BLWM and air cleaner terminal EAC 1 will remain energized for 90 120 150...

Page 36: ...tart Up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 36 WIRING DIAGRAM A19...

Page 37: ...f s u o i v e r p o n s a w r a t s l l i w r e c u d n i e h T e c n e u q e s t s e t t n e n o p m o c f e i r b a h g u o r h t o g l l i w n u r d n a t w o l b I S H e h T t s e t t n e n o p m...

Page 38: ...estricted duct system Loose blower wheel Defective switch or connections Defective blower motor or capacitor Inadequate combustion air supply flame rollout switch open Restricted vent Proper vent sizi...

Page 39: ...ealer listing by brand name or contact BRYANT HEATING COOLING SYSTEMS Consumer Relations Department P O Box 4952 Syracuse New York 13221 4952 1 800 428 4326 Have available the model number series numb...

Page 40: ...46231 Edition Date 03 20 Catalog No II800SA 04 Replaces II800SA 03 800SA 801SA Installation Start Up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any...

Reviews: