OL-B300-17
04
05
drain
02
03
Page 1: ...B300 XL ODL BRUSTOR OUTDOOR SUN SYSTEMS www brustor com HOLIDAY AT HOME Mounting instructions GB V2018 04...
Page 2: ...be 8 b Corner reinforcement 8 c Extensie vertical pole 8 d Drain side 8 e Mounting the fabric 8 f Mounting the fabric fixation rail 9 FINISHING ROOF 9 a Coverplates W and L side 9 b Rooftop covers 10...
Page 3: ...for coupling pole Vertical pole pre assembled screenguide Cover vertical pole Fixation for groundanchor Drain Tube D50 not delivered Corner reinforcement Cover plate L side Corner drain Rain gutter Ro...
Page 4: ...ck the diagonals the difference should not be more than 5mm 1 a STAND ALONE W L W L L 3 1 2 W 3 1 2 W 3 1 2 L 3 1 2 Pole Support Ground Anchor Floorplate 20x20 W L L L 3 1 2 W 1 3 4 W 1 3 4 L 3 1 2 W...
Page 5: ...OL B300 03 L w W 9 7 8 4 7 8 4 7 8 1 b WALL FIXATION 1 4 L W W 9 7 8 4 7 8 4 7 8 4 7 8 1 4 SINGLE COUPLE Use the dimensions mentioned above but add 5mm next to the wall H 4 3 8 H 1 4 5 1 2 1 4...
Page 6: ...the supports Make sure that the pole is mounted perfectly vertical If necessary fill up the bumps One of the poles contains the electrical supply for the louvremotor and possibly the led lights Make s...
Page 7: ...four bolts in the profile M8x25 Do not fasten them completely leave 10 to 15mm free space Make sure a gasket is placed at the end of the profile Hook the middleguide between the 2 screenboxes 1 Secure...
Page 8: ...ve the rollertubes from the screens Position the doorprofile below the structure and fix it 1 Make sure the post is flush with the main housing 2 4 x DIN 912 M8x25 Coverplate couple pole wall fixation...
Page 9: ...ly level If necessary use some provisional filling 4 a LEVELNESS Check the perpendicularity trough the following dimension L1 2mm Also check the diagonals of the top side If necessary the pole support...
Page 10: ...ERTUBE SINGLE The rollertube support can be installed in 2 different ways depending on the type of fabric see drawing underneath Before installing the rollertube suports the gaskets should be pierced...
Page 11: ...pole Tilt the screen in the brackets as shown on the drawing 2 and secure them at both ends M4x20 3 Place the cable as shown below numbers 2 and 3 only count for the most distant screens number 1 on t...
Page 12: ...cal pole with the electrical supply should look like this The number of cables depend on the numbers of screens that have been installed The connection of the cables will be explained later on Place i...
Page 13: ...he plastic guides in the groove under the rollertube Slide them completely to the left and right side of the screen and secure them with two screws Push the pieces down while thighting the screws Slid...
Page 14: ...shortest hooks on the other side With a construction with 3 arms you position the third arm in the middle Position the arm parallel to the frame and place the outer arms right next to the vertical pol...
Page 15: ...rst through the arm on the motor side 2 Split up the arms again until they are positioned right next to the vertical poles Then put the head piece and end piece of both arms over the socket set screws...
Page 16: ...he extension Tighten the bolts in order to fix the corner reinforcement 8 c EXTENSION VERTICAL POLE Take the corner reinforcement out of the pole and place the pole extension on the pole with the hole...
Page 17: ...cannot be changed see figure 8 d DRAIN SIDE y x WATER Fabric fixation rail Last flow profile First fabric Last fabric W1 L2 W2 L1 Rollertube Provide each flow profile with 2 hooks at the ends of the...
Page 18: ...out of the fabrics 8 f MOUNTING THE FABRIC FIXATION RAIL Screw the fabric fixation rail to the frame 1 Re slide the first flow profile on to the first and second fabric 2 Clip the cover on the flow pr...
Page 19: ...OL B300 17 04 05 drain 02 03...
Page 20: ...oles Fix the second cover plate W side on the frame slide the cover under the end pieces of the arm 1 and screw through the provided holes 2 In case of projection 4m also screw the cover on the arm th...
Page 21: ...rst roof cover over the rollertube and on the arms 1 Apply a continuous stroke of silicone on the total length of the cover 2 Place the second cover over the first cover and make sure the vertical lip...
Page 22: ...ell positioned while closing the cover When there are multiple screens Connect one of the motors to the electricity grid 230V Adjust the endpoints and assign the remote control to the motor DISCONNECT...
Page 23: ...acuation hole per part Preferably the drain will be installed at the lowest side of the roof place one draining point every 15m Put the corner pieces in the holes in the vertical poles Drain can be pl...
Page 24: ...position starting from the top 1 Make sure the gasket is not damaged First close the roof so it s not interfering Screw the corner piece M6 x 40 2 While screwing push the corner piece firmly against...
Page 25: ...a top cover on top of the poles The cover can be mounted in two directions IMPORTANT pass the cables at the side of the box as shown below 1 do not drill any hole at the top of the box Connect the sc...