16
Frameworx to LCD Interface Pre-Installation
40" WIDE SCREEN LCD MONITOR WITH FRAMEWORX LCD INTERFACE
All Scoring Systems
Electrical Information
Volts
Hertz
AC/DC
Phase
Amps *
Watts
Branch Circuit
Customer Responsibility
Per Unit
Install circuit with 120 Volt
Hubbell I.G. 5262 receptacle
100-130
50/60
A C
1
3.5 @
420
2 Wires +
or equivalent.
120 V
Isolated Ground
No more than 4 LCD overheads
per 20 amp circuit.
Install circuit with appropriate
I.G. receptacle
200-240
50/60
A C
1
1.75 @
420
2 Wires +
No more than 6 LCD overheads
240 V
Isolated Ground
per 16 amp circuit.
Customer Responsibility: Using the preferred method of support, the overhead is to be suspended from beams which
are supported from roof trusses. The I.G. receptacle is to be installed flush with the ceiling and located near the rear
suspension wire on the center line of a pair of lanes. The customer is responsible for supplying, installing, and
maintaining the proper position of the support beams or pipe. The customer is also responsible for having the structure
certificate form completed by an architect or structural engineer. The method of support must be capable of supporting
480 pounds actual/static load per lane pair.
NOTE: If support beams are installed, they must be as straight as possible. Any variation in the support will affect
overhead positioning.
Installation Information
* NOTE: Amps per circuit includes the LCD monitor and Frameworx LCD Interface electronics.