7
Power ON
The power ON sequence for the tachometer and speedometer includes a
Self-Test which occurs at every power ON event.
Turn the ignition key to the ON position. Starting the engine is not required.
The Self-Test process includes the following steps:
1.) If initialization is complete, the LCD will display SELF TEST. All of the
lights in the ICON Pro Gauge will blink. First the dial lights will blink, foll-
lowed by the LCD backlights, and finally the warning lights will blink.
2.) All gauge pointers will return to the zero position
3.) All gauge pointers will sweep to full scale
4.) All gauge pointers will go to current value
The
ICON
tachometer and speedometer LCD screens will display SELF
TEST COMPLETE!
When the Self-Test is complete, if the LCD screen displays data, then the
system initialization has already been completed.
The System Setup screen will appear if the system initialization has not
been completed. Use the Initialization process to complete the required
system setup.
009963
Summary of Contents for Evinrude E-TEC Icon Pro Series
Page 2: ......
Page 7: ...ICON PRO SERIES Gauge Setup ...
Page 32: ...30 ...
Page 33: ...Tachometer Operation ...
Page 109: ...Speedometer Operation ...
Page 130: ...128 ...
Page 131: ...Troubleshooting ...
Page 139: ...Reference ...
Page 145: ...143 Notes ...
Page 146: ...Product Warranty ...
Page 150: ...148 ...
Page 152: ......
Page 154: ......
Page 155: ......