© 2020 BROWAN COMMUNICATIONS INC.
17
Step 3
:
Installing the Adjustable Plate
Fasten the adjustable plate against the wall by securing it with hexagon screws. Figure as
illustrated in the following.
Figure 13 Installation Diagram of Adjustable Plate
Step 4
:
Assembling the Base Frame and Ground Wire
Secure the base frame of the mount kit to the Gateway with M5x8mm screws and connect the
ground wire. The ground wire portal is situated at the corner of the Gateway with a icon.
Figure 14 Assembling Diagram of Base Frame