OPERATION
TUBE LIFT- RACK CONTROL SWITCH.
The Tube Lift-Rack Control Switch ‘
A
’.
•
To raise the Tube Rack, press the top of the
switch - ‘
UP
’.
•
To lower the Tube Rack, press the bottom of
the switch - ‘
LOWER
’.
WARNING
Before removing tubes from the Tube Rack, to load
the Tube Dispenser, or when loading the Tube Rack:
•
The operator must stop the harvester and
switch the tractor engine ‘
OFF
’.
•
Failure to observe this precaution could result
in serious injury.
TUBE LIFT RACK.
Loading the Tube Lift Rack.
•
Open the Access Door ‘
B
’, to Load the Tubes,
IMPORTANT
Do not overload and jam the tubes against the Lift
Rack top lifting brackets.
TUBE DISPENSER.
The Tube Dispenser Lever.
•
To dispense a Tube into the Roll-Up Conveyor
pull the Dispenser Lever ‘
C
’, ‘
FORWARD
’,
only when Roll-Up Conveyor is correctly
positioned on the return swing.
•
The Tube Dispenser can hold five tubes. It is
loaded manually From the Tube Rack.
3-08
Summary of Contents for 5990280/1
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 19: ...SAFETY 1 11 Warning Decals This page intentionally left blank ...
Page 22: ......
Page 34: ......
Page 57: ...LUBRICATION SCHEDULE SECTION 4 General Information 4 01 Lubrication Charts 4 02 4 03 ...
Page 58: ......
Page 61: ...LUBRICATION 4 03 AUTO STEER ...
Page 62: ......
Page 64: ......
Page 70: ......
Page 71: ...ELECTRICAL SECTION 6 Electrical Control Box 6 01 Electrical Schematic 6 02 6 06 ...
Page 72: ......
Page 79: ......