5.2
Assembly of flue cascade systems BK 250/1 and BK 250/2 (flue outlet at the back)
Assemble the components listed in the table as shown in
fig
.
Important
Apply lubricant to gaskets.
Important
Route the flue with a fall towards the combustion equipment so
the condensate can drain from the flue to the central condensate
collector or to the siphon connection. The minimum fall for a
horizontal flue pipe is min. 3 ° (5.5 cm / m).
Fig.6
Assembly (flue outlet at the back)
RA-0001888
1
2
3
4
5
6
2
2
3
2
2
2
6
1 End cover without siphon connection
2 Clamp
3 Tee for flue entry
4 Tee for flue exit
5 End cover with siphon connection
6 Eccentric connector 160/250 or 200/250
5 Installation
en
358643 - 02 - 27022020
17
Summary of Contents for BK 250/2
Page 10: ...de 5 Installation 10 358643 02 27022020 ...
Page 18: ...en 5 Installation 18 358643 02 27022020 ...
Page 26: ...fr 5 Installation 26 358643 02 27022020 ...
Page 34: ...it 5 Installazione 34 358643 02 27022020 ...
Page 42: ...es 5 Instalación 42 358643 02 27022020 ...
Page 50: ...pl 5 Montaż 50 358643 02 27022020 ...
Page 58: ...cs 5 Instalace 58 358643 02 27022020 ...
Page 66: ...ru 5 Установка 66 358643 02 27022020 ...
Page 74: ...lt 5 Montavimas 74 358643 02 27022020 ...
Page 76: ...August Brötje GmbH 26180 Rastede broetje de 358643 02 27022020 ...