8
4.
Check that the lower tube marker and the main body tube
marker are matched and connect the tubes one by one from
the main body side tube (a).
IMPORTANT
Avoid intersecting the tubes when connecting
them.
Secure a clearance of at least 1 mm when
connecting the tubes.
5.
Mount the fastening holder with screws.
Install the removed right cover and tighten the screws.
Electric wiring connection
1.
Remove the tank unit screws, and remove the cover by lifting it
up a little and drawing it out in the arrow-pointed direction.
2.
Loosen the nut and fit the connector cover with the harness.
TIPS
The connector cover hole (b) may be oriented to
either side.
X0301
(a)
at least 1 mm
at least
1 mm
X0302
X0367
(b)
X0368
Summary of Contents for GTX pro Bulk
Page 9: ...viii 8 9 10 11 China only ...