background image

 

 

NOV12GB Issue 2 

 

 

 

Contents

   

 

 

 

 

 

 

 

 

 

 

 

Introduction 

          3 

Packing List   

 

 

 

 

 

 

 

 

 

Health & Safety 

 

 

 

 

 

 

 

 

 

 
Specifications          5 
Dimensions   

 

 

 

 

 

 

 

 

 

Hearth 

Requirements 

Clearances 

      7 

Chimney 

Requirements 

        8 

Combustion 

Air 

Requirements 

       9 

Assembly 

 

 

 

 

 

 

 

 

 

 

10 

 

 

 

 

 

 

 

Plumbing 

Advice 

         12 

 Example 

Four 

Pipe 

Layout 

       14 

 Example 

Three 

Pipe 

Layout 

      15 

 Example 

Two 

Pipe 

Layout 

       16 

 
Stove Operation 
 Controls 

Layout 

        17 

 Controls 

Explained 

        18 

 Airwash 

System 

        18 

 

 

Recommended 

Fuels 

        19 

 
Lighting 

the 

Stove 

          

 Kindling 

Stage 

        20 

 Burning 

Wood 

Burning 

Coal 

      21 

 

Warning Notes  

 

 

 

 

 

 

 

  22 

 

 

Maintenance 
 

Ash Removal 

 

 

 

 

 

 

 

 

23 

 

Chimney Fires 

 

 

 

 

 

 

 

 

23 

 Chimney 

Sweeping 

        23 

 General 

Stove 

Cleaning 

       23 

 

Glass Cleaning 

 

 

 

 

 

 

 

 

23 

 Annual 

Stove 

Service 

       23 

 

 

Trouble-shooting 

         24 

Commissioning Form 

 

 

 

 

 

 

 

 

25 

Spare Parts   

 

 

 

 

 

 

 

 

 

26 

EC Declaration 

 

 

 

 

 

 

 

 

 

27 

Annual 

Service 

Record 

        28 

Warranty 

 

 

 

 

 

 

 

 

 

 

29 

 
 

Summary of Contents for Snowdon 30

Page 1: ...2 1 Installation Operating Instructions Covering Model s Snowdon 30 Multfuel Boiler Stove Open Vented Version Tested to EN 13240 These appliances must be installed and commissioned by a HETAS registe...

Page 2: ...ipe Layout 15 Example Two Pipe Layout 16 Stove Operation Controls Layout 17 Controls Explained 18 Airwash System 18 Recommended Fuels 19 Lighting the Stove Kindling Stage 20 Burning Wood Burning Coal...

Page 3: ...tions Local Authority Byelaws and other specifications or regulations as they affect the installation of the stove It should be noted that the Building Regulations requirements may be met by adopting...

Page 4: ...taken to avoid the possibility of personal injury CO Alarms Building regulations require that whenever a new or replacement fixed solid fuel or wood biomass appliance is installed in a dwelling an au...

Page 5: ...s appliance Maximum heat output to room kW 8 Maximum heat output to water kW 22 Flue diameter MINIMUM 6 Inch 150mm Efficiency 75 4 Temperature exhaust gas wood C 190 Optimal working temperature 70 75...

Page 6: ...NOV12GB Issue 2 6 Dimensions All dimensions are in millimetes...

Page 7: ...ve for fuel to fall out a fender must be fitted if the hearth is flush with the carpet These are just a few hearth specifications Please refer to Building Regulations Approved Document J Hearths for m...

Page 8: ...he vertical chimney height add additional flue insulation or possibly add a special cowl to the top of the chimney e g anti down draft cowl to eliminate wind induced down draft The outlet from the chi...

Page 9: ...double glazing etc Under UK building regulations any appliance over 5kW MUST have a fixed permanent air vent The requirement calls for 550mm2 of free ventilation per kW above the 5kW threshold which m...

Page 10: ...NOV12GB Issue 2 10 Assembly The diagram below shows the main components of the stove and how it can be broken down for transport purposes s from 6 down to 1...

Page 11: ...mbly It is important that the grates are installed the correct way up the slots in the grate are V shaped and should be situated so the narrowest part of the channel faces up this will allow ash to fa...

Page 12: ...boiler on this appliance is one singular open vessel so it is perfectly possible to only use two connections and cap the others off The top connections are the flow and bottom connections return It is...

Page 13: ...ce with the instructions for Assembly given previously On completion of the installation allow a suitable period of time for any fire cement and mortar to dry out a small fire may then be lit and chec...

Page 14: ...NOV12GB Issue 2 14 Example Four Pipe Plumbing Layout...

Page 15: ...NOV12GB Issue 2 15 Example Three Pipe Plumbing Layout...

Page 16: ...NOV12GB Issue 2 16 Example Two Pipe Plumbing Layout...

Page 17: ...NOV12GB Issue 2 17 Controls Layout The stove is fitted with a number of controls which need to be correctly operated in order to light and maintain a fire Thermostat...

Page 18: ...nter at a higher point inside the burn chamber and will provide an extra boost of heat This control can be used at initial start up and when an additional boost of heat is required Thermostat Control...

Page 19: ...other coal which are intended for use on open fires Suitable coal needs to be designed for use on closed appliances Open fires send a large amount of heat up the chimney therefore the fuel needs to bu...

Page 20: ...paper or scrunched up balls to form a bed on the grates Place a generous amount of dry kindling onto the newspaper ensure their is sufficient air gaps between the kindling a criss cross or pyramid sty...

Page 21: ...longer want to keep the fire going simply allow it to burn out Burning Coal With kindling complete you are now ready to add your approved coal Stage 4 Using the gloves and provided ash tool rake the...

Page 22: ...a flue pipe thermometer so that you can monitor how much heat you are sending up the chimney this will both enable efficient operation of your stove and also give a good indiction if you are over firi...

Page 23: ...p lint free cloth is normally sufficient however for stubborn build ups we would recommend using a very fine wire wool Chimney Sweeping It is essential that your chimney flue is swept at least once a...

Page 24: ...ey to prevent heat being drawn up the chimney to waste Green or wet wood is being burnt The chimney has excessive draw this is unusual Seek installer advice with regard to installing a Flue Draught St...

Page 25: ...______________ Address _________________________________________________________________ Telephone Inc area code ____________________________________________________ HETAS Registration Number ________...

Page 26: ...23 Cable Clip 24 Knob 25 26 Grate Set 27 Ashpan x 2 28 Glass Clip Screw 29 Glass Clip 30 Glass x 2 31 6mm Rope 32 12mm Rope 33 Hinge Pin x 4 34 Slider Bracket 35 Slider Handle 36 Slider 37 Hook 38 Was...

Page 27: ...ten Pr fstelle GmbH NOTIFIED BODY RRF 1625 Firmensitz Im Lipperfeld 34 b D 46047 Oberhausen The following harmonised standards and Technical specifications have been met and comply with good engineeri...

Page 28: ...NY NAME COMPANY ADDRESS POSTCODE 3RD YEAR SERVICE completion date SERVICE ENGINEER REG No COMPANY NAME COMPANY ADDRESS POSTCODE 4TH YEAR SERVICE completion date SERVICE ENGINEER REG No COMPANY NAME CO...

Page 29: ...its Replaced parts or components will become the property of Broseley Fires Should you wish to claim under the warranty please contact the supplier dealer from whom you purchased the appliance Do not...

Reviews: