Brooks Instrument GT 1305 Installation And Operation Manual Download Page 20

Installation and Operation Manual

X-VA-1305-1306-eng-eu 

PN 541-C-029-AAG 

April, 2008

Models GT 1305 & 1306 

20

E-Mail [email protected]

www.BrooksInstrument.com

E-Mail [email protected]

E-Mail [email protected]

TRADEMARKS

Brooks ...................................................... Brooks Instrument, LLC.

BUNA .....  ................................................. DuPont Dow Elastomers

Kalrez ....................................................... DuPont Dow Elastomers

Teflon .............................................. E.I. DuPont de Nemours & Co.

Viton ............................................DuPont Performance Elastomers

LIMITED WARRANTY

Seller warrants that the Goods manufactured by Seller will be free from defects in materials or workmanship under normal use 
and service and that the Software will execute the programming instructions provided by Seller until the expiration of the earlier of 
twelve (12) months from the date of initial installation or eighteen (18) months from the date of shipment by Seller.
Products purchased by Seller from a third party for resale to Buyer (“Resale Products”) shall carry only the warranty extended by 
the original manufacturer.
All replacements or repairs necessitated by inadequate preventive maintenance, or by normal wear and usage, or by fault of 
Buyer, or by unsuitable power sources or by attack or deterioration under unsuitable environmental conditions, or by abuse, 
accident, alteration, misuse, improper installation, modification, repair, storage or handling, or any other cause not the fault of 
Seller are not covered by this limited warranty, and shall be at Buyer’s expense.
Goods repaired and parts replaced during the warranty period shall be in warranty for the remainder of the original warranty 
period or ninety (90) days, whichever is longer.  This limited warranty is the only warranty made by Seller and can be amended 
only in a writing signed by an authorized representative of Seller. 

BROOKS SERVICE AND SUPPORT

Brooks is committed to assuring all of our customers receive the ideal flow solution for their application, along with outstanding 
service and support to back it up. We operate first class repair facilities located around the world to provide rapid response 
and support. Each location utilizes primary standard calibration equipment to ensure accuracy and reliability for repairs and 
recalibration. The primary standard calibration equipment to calibrate our flow products is certified by our local Weights and 
Measures Authorities and traceable to the relevant International Standards. 

Visit www.BrooksInstrument.com to locate the service location nearest to you.

START-UP SERVICE AND IN-SITU CALIBRATION

Brooks Instrument can provide start-up service prior to operation when required.
For some process applications, where ISO-9001 Quality Certification is important, it is mandatory to verify and/or (re)calibrate the 
products periodically. In many cases this service can be provided under in-situ conditions, and the results will be traceable to the 
relevant international quality standards.

CUSTOMER SEMINARS AND TRAINING

Brooks Instrument can provide customer seminars and dedicated training to engineers, end users and maintenance persons. 
Please contact your nearest sales representative for more details.

HELP DESK

In case you need technical assistance:
 

Americas   

 1-888-554-FLOW

 

Europe  

 +(31) 318 549 290 

Within Netherlands 

 0318 549 290

 

Asia  

 +011-81-3-5633-7100

Due to Brooks Instrument's commitment to continuous improvement of our products, all specifications are subject to change 
without notice.

Summary of Contents for GT 1305

Page 1: ...Installation and Operation Manual X VA 1305 1306 eng eu PN 541 C 029 AAG April 2008 Models GT 1305 1306 1 Brooks O ring Seal Flowmeters Model 1306...

Page 2: ...plied with the product Inform and educate your personnel in the proper installation operation and maintenance of the product Install your equipment as specified in the installation instructions of the...

Page 3: ...highest quality available offering superior performance reliability and value to the user It is designed with the ever changing process conditions accuracy requirements and hostile process environment...

Page 4: ...2 Installation 2 1 General 8 2 2 Return of equipment 8 2 3 Recommended storage practice 8 2 4 Return shipment 9 2 5 Transit precautions 9 2 6 Installation 10 Section 3 Operation 3 1 Start up 11 3 2 R...

Page 5: ...3 Repeatability 0 5 Scale length GT 1305 75 mm GT 1306 127 mm Materials of construction End fittings Brass or 316 SS fitted in aluminium collar Metering tubes Borosilicate glass Floats 7 1306 Glass 31...

Page 6: ...133 FE 1400 3580 8 36 8 40 0 108 0 8 66 Table 2 Flow Ranges For GT 1306 SIZE TUBE TYPE FLOAT MODEL WATER V I C 2 AIR CODE l h P kPa cSt m3n h P kPa 7 R 7M 127 1F Glass A1 31 0 25 1 1 20 0 25 316 SS A3...

Page 7: ...with built in flow control needle valve The internal diaphragm actuated control valve is positioned by the incoming fluid pressure on one side of the diaphragm and outlet pressure spring action on the...

Page 8: ...3569 Tel 215 362 3700 Fax 215 362 3745 E mail BrooksAm BrooksInstrument com www BrooksInstrument com Brooks Instrument Brooks Instrument Neonstraat 3 1 4 4 Kitasuna Koto Ku 6718 WX Ede Netherlands To...

Page 9: ...Eu BrooksInstrument com Instrument must have been purged in accordance with the following All flow instruments returned to Brooks requires completion of Form RPR003 1 Brooks Instrument Decontamination...

Page 10: ...t for damage during shipping b The indicator must be installed with the inlet at the bottom and the outlet at the top and must be installed as near vertical as possible to maintain indicator accuracy...

Page 11: ...tion When initiating flow slowly open the valve to avoid a flow surge By pass is a help in bringing the flow on smoothly Avoid starting a pump to supply the flowmeter without the use of a valve upstre...

Page 12: ...the polycarbonate sleeve surrounding the flow tube e Remove the float from the tube f Using a suitable solvent carefully swab and flush the inside of the metering tube Clean the float and blow dry al...

Page 13: ...ation Should the equipment require repair contact the nearest sales service office It is important that servicing is performed only by trained and qualified service personnel If the equipment is not p...

Page 14: ...R SIZE A B C D E F G H J SIZE 7 127 300 1 2 60 250 264 261 55 55 SIZE 8 127 300 1 2 60 250 264 261 55 55 SIZE 10 127 300 1 66 250 264 261 58 57 PANEL CUT OUT FOR BACK PANEL MOUNTING PANEL CUT OUT FOR...

Page 15: ...Installation and Operation Manual X VA 1305 1306 eng eu PN 541 C 029 AAG April 2008 Models GT 1305 1306 15 Section 6 Exploded view and parts lists Section 6 Exploded view and part lists...

Page 16: ...B 049 BNA 8 RV 31 316 SS FLOAT 2 1 346 B 050 BNA 8 RS 31 316 SS FLOAT 2 1 346 B 148 BNA 8 RV 8 316 SS FLOAT 2 1 346 B 149 BNA 8 RV 14 316 SS FLOAT 2 1 346 B 154 BNA 8 RS 8 316 SS FLOAT 2 1 346 B 155 B...

Page 17: ...Kalrez CODE CONNECTION TYPE 1 NPT 2 BSP CODE SCALE TYPE A mm Decal cal curve Class 6 GT 1305 only B mm Decal cal curve Class 4 GT 1305 only C mm Decal cal curve Class 2 5 GT 1306 only D mm Decal cal c...

Page 18: ...18 This page was intentionally left blank...

Page 19: ...19 This page was intentionally left blank...

Page 20: ...onger This limited warranty is the only warranty made by Seller and can be amended only in a writing signed by an authorized representative of Seller BROOKS SERVICE AND SUPPORT Brooks is committed to...

Reviews: