Installation and Operation Manual
X-VA-1305-1306-eng-eu
PN 541-C-029-AAG
April, 2008
Models GT 1305 & 1306
13
Reassemble the flowmeter as follows:
a. Carefully install the float in the tube with the metering edge up.
b. Carefully hold the tube (with float installed), sleeve, and end fitting, and
push the tube into the top fitting.
c. Tighten the four (4) side plate screws in place.
d. Install the front and rear windows.
4-2 Service information
Should the equipment require repair, contact the nearest sales/service office.
It is important that servicing is performed only by trained and qualified service
personnel. If the equipment is not properly serviced, serious personal injury
and/or damage to the equipment could result.
Section 4 Maintenance
Notice
Anytime the meter is removed for service, new O-rings should be installed in
both the inlet and outlet end fitting.
Warning
Pressure test the meter before returning it to service. Hydrostatic pressure testing
should be performed by qualified personnel or serious injury and/or damage to
the equipment can result.