background image

 

 

brookfield NB-2000HD2 Door Operator Installation Instructions 

 

Although each 

Door Operator

 has been fully inspected and tested prior to shipment, assure that 

no physical damage has occurred during shipping and handling.  
  

1.  Position 

Door Operator

 in the horizontal and vertical directions as indicated on installation drawing 

NB-2000-HD2-81

 for pull open applications. 

Locate 

Slider Block

 assembly on door as shown on installation drawing 

NB-2000-HD2-81

 for pull 

open applications.  For Push Open applications refer to drawings: 

NB-2000-HD2-86, -87

    

2.  Mount 

Door Operator

 base plate with (6) 3/8”diameter Grade 5 bolts and tighten properly (not 

included). For pull open application, weld 

Mounting Block

 directly to door as indicated or bolt 

Slider Block

 directly to door with (2) 3/8”diameter socket head cap screws (included). For push 

open application, mount the door attachment pivot with (2) 3/8” diameter grade 5 bolts and properly 
tighten with lock washers. 

3.  With 

Linkage Arm

 disconnected, measure force near the lock edge of the door to accelerate the 

door to opening and closing speeds.  This force, times the distance to the hinge pin centerline shall 
not exceed the 

Rated Operating Torque of 6000 lb-in

.  

4. 

Check 

Linkage Arm 

to assure it doesn’t interfere with the door or 

Slider Block

.  In addition, make 

sure cam follower (of 

Linkage Arm

) is properly engaged in 

Slider Block

.  

Proper engagement is 

defined as full engagement (–1/16”) max. 

5.  With 

Linkage Arm

 connected and power removed, measure force to open door/ backdrive (at 

constant velocity).  This force must be £ 50 lb (per 

UL 325 section 29.3

) and be applied near the 

lock edge of the door. 

6.  All 

PLC

 and 

Motor Control

 settings have been preset by brookfield industries, inc.; however, we 

recommend these values be double-checked with the 

Parameter

 sheet supplied. 

7.  Install activation switches or push button stations: (a) within sight of the door, (b) at a minimum 
height of 5’ so small children cannot reach and (c) away from moving parts of the door. 
8.  Before wiring 115 AC supply voltage to operator, assure power is disconnected and all “Lock-Out” 
Safety Procedures have been strictly adhered to. 
9.  Connect 115 VAC and class (2) 24 VDC wiring as shown on 

Terminal Strip Hookup Legend 

and

 

Wiring Diagrams.   

Disconnect “Lock-Outs” and turn on breakers. 

10. Assure speed trimpots on 

Multi-Speed Board (Presets 1-4

) are in the 25% range before activating 

operator. 
11. Make sure that all 

Safety Instructions

 and 

Warnings

 have been followed. 

12. Activate 

Open

Partial Open

 and 

Close 

commands.  

13. Adjust 

Presets 1-4

 clockwise until the minimum opening and closing times listed in 

Table 1

 have 

      been obtained. 
14. Adjust 

Door Position

 factory presets as required using the 

DAU

.  Refer to the 

DAU Instruction

,  

 

     Door Position Setup Instructions 

and

 Parameters 

as required.

 

15. Check and adjust, if necessary, the trimpot settings (refer to the 

Parameter

 sheet) on the 

Motor       

  

 

      Control

16. Check 

Entrapment Protection

 in both directions.  This is accomplished by measuring the force 

      that prevents a stopped door from moving in a particular direction and can be accomplished with a   

      

simple force gage.   This force must be 

 40 lbs and is applied at the latch side per 

UL 325 section 

 

      

29.4 Entrapment

.  When measuring this force be careful not to erroneously measure the inertia 

      force of the door.  This can be accomplished by first stopping the door without the gage, then 
      substituting the gage with the minimum force to keep the door from moving in that particular 
      direction.  This force is adjusted by varying the 

FCL 

and 

RCL 

trimpots settings on the 

Motor  

      Control.

        

  

Summary of Contents for NB-2000-HD2

Page 1: ...brookfield industries inc Commercial Industrial Door Operator Installation Instructions C 99 W Hillside Ave Thomaston CT 06786 P 860 283 6211 F 860 283 6123 www bfimfg com info bfimfg com NB 2000 HD2...

Page 2: ...1of this manual Assure all electrical wiring and grounding is installed as specified in this manual and as required by any local codes Proper installation can also reduce the risk of electrical shock...

Page 3: ...that all personnel are clear of the path of this operator and the door that it is attached to 2 Assure that all fingers hands feet limbs and articles of clothing are clear of all moving parts and pinc...

Page 4: ...eset by brookfield industries inc however we recommend these values be double checked with the Parameter sheet supplied 7 Install activation switches or push button stations a within sight of the door...

Page 5: ...ead Door or Follow Door on the next screen Fig 5 then skip to step 5 Fig 2 Fig 3 Fig 4 Fig 5 4 Selecting Standard will give you the screen shown in Fig 6 Choose the appropriate serial number series of...

Page 6: ...t Inputs to display the Input Diagnostic Screen Fig 10 Fig 10 The buttons down the left side represent an actual input to the PLC All standard Operator functions can be tested using these buttons The...

Page 7: ...select Lead or Follow Door on the next screen then skip to step 6 4 For Standard operator choose the appropriate ship date of the operator on the next screen 5 You ll be given a display of the first t...

Page 8: ...ose Enable preset to the Door Position value plus 30 units i e if the Door Position is 310 set the Auto Close Enable to 340 Note Some installations may require slightly higher lower values for best re...

Page 9: ...2 77 82 86 90 94 84 64 71 77 84 90 95 100 105 110 96 73 81 89 96 103 109 115 120 125 PER ANSI 156 10 For weights and widths not listed TIME DOOR WIDTH X DOOR WEIGHT 1 2 188 Minimum Opening Time second...

Page 10: ...10VAC THRU LEFT SIDE OF COVER 4 1 2 DIA THRU HOLES FOR 3 8 DIA GRADE 5 BOLTS TYP 6 PLACES TYP 2 PLACES FRONT ELEVATION SIDE ELEVATION L 110 VAC INPUT SPA CER REFERENCE LEGEND INSIDE COVER SPEED BOARD...

Page 11: ...1 F E D 2 3 C B A 1 2 3 4 Date Material 6 7 Scale 8 F D E Checked by Drawn by Decimal Fractional Angular Tolerances 5 Revision note 6 Rev 7 B C Notes A Date Sign 8 Check...

Page 12: ...NE FRONT ELEVATION SIDE ELEVATION SPEED BOARD LEGEND BRACKET DETAIL 1 F E D 2 3 C B A 1 2 3 4 Date Material 6 7 Scale 8 F D E Checked by Drawn by Decimal Fractional Angular Tolerances 5 Revision note...

Page 13: ...6 4 294 4 1 1 5 6 1 4 4170 25 24 5 6 24 5 6 25 24 5 6 25 25 8 02765 8 176276 6 4 0 564 2 11 72 1 1 0 0 176 8 0 9 4 9 55 8 10 4 52 4 4 1 0 24 5 6 0 0276 CVG RRTQXGF D FCVG CVGTKCN brookfield industrie...

Page 14: ......

Page 15: ...ging Door Operator Information contained herein is exclusive property of brookfield industries inc and may not be duplicated in part or in whole without written consent Line Note 10 Review Page 2 for...

Page 16: ...ators reverse M1 M2 at motor 11 When using receptacle style chargers ue GFC I type 12 Provides auto open during power loss 13 Additional N terminal block for battery backup only For 220 VAC Power See...

Page 17: ...ic opening during power loss The battery backup system is an optional addition Relay 110 220 VAC Input IPDT 6A Output Note 9 NEMA Enclosure A2 14 Note 16 12 11 A1 Spacer 1 1 1 1 3 3 9 9 10 10 11 11 12...

Reviews: