10. MECHANICAL FUSE REPLACEMENT

CAUTION!

All operations of connection or maintenance must be carried out with the damper closed and de-energized.

Operation

Fuse replacement is required every time the peak temperature within the duct, has exceeded the specified degrees 

Celsius on the same fuse. A tab shows the status of the fuse (fig. 9), when the body disappears into the plastic fuse 

holder (fig. 10), it is necessary to replace the fuse.

fig. 9

fig. 10

MDF 25 L

 

 

Istruzioni di installazione e uso MDF 25L (rev.1-01/2016)

 

 brofer.it                                                                                                               

                                           

pag. 6/7

 

 

 

SOSTITUZIONE DEL FUSIBILE MECCANICO 

 

Avvertimento !

 

Tutte le operazioni di collegamento o manutenzione devono essere effettuate con serranda chiusa e in assenza di 

tensione. 

 

Funzionamento 

La sostituzione del fusibile si rende necessaria ogni volta che la temperatura di picco all’interno della condotta, abbia 

superato i gradi centigradi indicati sul fusibile stesso. Una linguetta indica lo stato del fusibile (fig.9), quando scompare 

dentro il corpo in plastica porta fusibile (fig.10), è necessaria la sostituzione del fusibile. 

 

 

 

 

 

 

 

Procedimento: 

Assicurarsi che la serranda sia disarmata verificando visibilmente che 

l’indicatore 

sulla leva indichi il simbolo ]-[ 

presente sul carter. In caso contrario, agire sul pulsante di test per chiudere manualmente la serranda. 

Rimuovere la copertura plastica trasparente svitando la vite di fissaggio centrale (fig.11) 

Svitare le 2 viti con testa a croce ed estrarre il meccanismo di rilascio dalla piastra. 

Sostituire il fusibile comprimendo la molla e agganciandolo ai due perni sporgenti (fig.12) 

 

 

 

                               

 

 

 

Fig. 9 

Fig. 10 

Fig. 11 

Fig. 12 

Copertura 

trasparente

 

Vite di fissaggio 

centrale

 

Vite di fissaggio 

meccanismo 

di rilascio

 

Procedure:

• Make sure the damper is unarmed 

verifying visibly that the indicator on 

the lever indicates the symbol] - [on 

the carter. Otherwise, act on the test 

button to manually open the damper.

• Remove the clear plastic cover by 

unscrewing the central fixing screw 

(fig. 11).

• Unscrew the 2 screws and remove the 

release mechanism from the plate.

• Replace the fuse by compressing the 

spring and hooking the two protru-

ding pins (fig. 12).

fig. 11

fig. 12

Central

fixing screw

Fixing screw

release

mechanism

Clear plastic

cover

Summary of Contents for MDF25L

Page 1: ...making air better MDF25L INSTALLATION AND OPERATION MANUAL FIRE PROTECTION EN...

Page 2: ...RMATIVE REFERENCES 3 3 PRECAUTIONS FOR HANDLING AND INSTALLATION 4 4 MAINTENANCE 4 5 WALL INSTALLATION 5 6 CEILING INSTALLATION 5 7 LIGHT WALL INSTALLATION 6 8 SUGGESTIONS 6 9 OPERATING CONTROLS 7 10...

Page 3: ...n from heat and smoke seal The installer has the obligation to follow the installation procedures and use of the equipment described in this manual in order to comply with the same conditions as the s...

Page 4: ...MDF 25L rev 1 01 2016 MANUTENZIONE Non richiesta particolare manutenzione E comunque consigliabile eseguire periodicamente un controllo del corretto funzionamento dei dispositivi di azionamento e seg...

Page 5: ...e 1 4 Fix the damper to the wall using the brackets then fill with cement mortar class M10 Fig 3 1 6 CEILING INSTALLATION 1 Before proceeding with the installation verify the integrity of the damper t...

Page 6: ...A Table 1 4 Fix the damper to the wall using the brackets then fill with cement mortar class M10 and dab from both of the sides of the wall with the plasterboard thickness 12 5mm fig 2A fig 1A fig 3A...

Page 7: ...button shown in fig 6 Closure normally energized electromagnet Power the electromagnet to perform a function test unhook the power supply Closure normally de energized electromag net Switch off the p...

Page 8: ...orta fusibile fig 10 necessaria la sostituzione del fusibile Procedimento Assicurarsi che la serranda sia disarmata verificando visibilmente che l indicatore sulla leva indichi il simbolo presente sul...

Page 9: ...hes Cable section 2 5 mm rigid flexible with ferrule 1 5 mm Operating tem perature from 25 C to 70 C Electromagnet device If necessary you can equip the damper of an electromagnet that allows you to a...

Page 10: ...warning light The thermoelectric device is com posed of three fuses Fire dampers then become sensitive to the temperature inside the duct with fuses Tf and Tf 2 3 which can be substituted and the ambi...