7. LIGHT WALL INSTALLATION

1  Before proceeding with the installation, verify the integrity of the damper, the correct positioning of the blade in the 

closed position and operation of the command.

2  Provide an opening in the wall (fig.1A) having larger dimensions than the nominal size of the damper (see table 1 

according to the type of installation).

3  Apply band expanding around the entire perimeter of the damper. Place the center of the opening the damper and 

making sure that the blade in the closed position is parallel to the wall. Maintain the axis of rotation of the blade 

horizontal as from tests carried out. Observe the projections indicated in fig.2A Table 1.

4  Fix the damper to the wall using the brackets, then fill with cement mortar class M10 and dab from both of the sides 

of the wall with the plasterboard thickness 12.5mm.

fig. 2A

fig. 1A

fig. 3A

perimeter expanding band

fill with mortar
class M 10

plasterboard

dab thickness

sp. 12,5 mm

Table 1

Certified Installation

P (mm)

S1 (mm)

S2 (mm)

Quote X

Quote Y

Wall -  aerated concrete

100

175

25

120

120

Light wall - Plasterboard

150

150

0

120

120

Ceiling - aerated concrete

100

175

25

100

100

8. SUGGESTIONS

After installation it is recommended to perform a function test by checking the correct rotation of the blade and the 

efficiency of the command (manual or motorized). It can be done in manual version rearming, with the lever, the 

damper and pressing the test button simulating so the operation. In the motorized version act on the lever of the 

thermoelectric fuse.

Summary of Contents for MDF25L

Page 1: ...making air better MDF25L INSTALLATION AND OPERATION MANUAL FIRE PROTECTION EN...

Page 2: ...RMATIVE REFERENCES 3 3 PRECAUTIONS FOR HANDLING AND INSTALLATION 4 4 MAINTENANCE 4 5 WALL INSTALLATION 5 6 CEILING INSTALLATION 5 7 LIGHT WALL INSTALLATION 6 8 SUGGESTIONS 6 9 OPERATING CONTROLS 7 10...

Page 3: ...n from heat and smoke seal The installer has the obligation to follow the installation procedures and use of the equipment described in this manual in order to comply with the same conditions as the s...

Page 4: ...MDF 25L rev 1 01 2016 MANUTENZIONE Non richiesta particolare manutenzione E comunque consigliabile eseguire periodicamente un controllo del corretto funzionamento dei dispositivi di azionamento e seg...

Page 5: ...e 1 4 Fix the damper to the wall using the brackets then fill with cement mortar class M10 Fig 3 1 6 CEILING INSTALLATION 1 Before proceeding with the installation verify the integrity of the damper t...

Page 6: ...A Table 1 4 Fix the damper to the wall using the brackets then fill with cement mortar class M10 and dab from both of the sides of the wall with the plasterboard thickness 12 5mm fig 2A fig 1A fig 3A...

Page 7: ...button shown in fig 6 Closure normally energized electromagnet Power the electromagnet to perform a function test unhook the power supply Closure normally de energized electromag net Switch off the p...

Page 8: ...orta fusibile fig 10 necessaria la sostituzione del fusibile Procedimento Assicurarsi che la serranda sia disarmata verificando visibilmente che l indicatore sulla leva indichi il simbolo presente sul...

Page 9: ...hes Cable section 2 5 mm rigid flexible with ferrule 1 5 mm Operating tem perature from 25 C to 70 C Electromagnet device If necessary you can equip the damper of an electromagnet that allows you to a...

Page 10: ...warning light The thermoelectric device is com posed of three fuses Fire dampers then become sensitive to the temperature inside the duct with fuses Tf and Tf 2 3 which can be substituted and the ambi...

Page 11: ......

Page 12: ...R SRL Via Roma 66 31023 Resana TV Italy Tel 39 0423 716611 Fax 39 0423 716612 info brofer it www brofer it making air better www brofer it INSTALLER 19 143 43 211 70 55 500 210 21 30 051 Fax 210 22 23...

Reviews: