![Brodie BiRotor B061A Installation & Operation Manual Download Page 17](http://html1.mh-extra.com/html/brodie/birotor-b061a/birotor-b061a_installation-and-operation-manual_2817565017.webp)
Page 17/37
IOM BiRotor 3” to 6” R03
The meter should be securely mounted on a wooden
skid for shipment. The original container or a solid
wooden box should be used to protect the exterior of
the meter.
When packing the meter or components for return to
the factory, place the RMR and a copy of the packing
list that was delivered with the meter inside an enve-
lope. Place the envelope inside the shipping container
with the Item being returned and reference the RMR
number on the outside of the shipping container.
Equipment returned to the factory without the
proper documentation will be returned to sender at
their expense.
Ship the container to:
Brodie Meter Co., LLC
Product Service Department
19267 Hwy. 301 North
Statesboro, GA 30461
Phone: 912-489-0200
Fax: 912-489-0294
[email protected]
10 Storage, Installation And
Operation
General
The following is a general outline for the proper stor-
age, shipment, installation, and start up of any Brodie
BiRotor meter. Additional information on the proper
use of Positive Displacement Meters can be obtained
from API Standard 1101 -Measurement of Petroleum
Liquid Hydrocarbons by Positive Displacement Meter.
Storage
Brodie meters are precision instruments and should
be handled with care. They should not be subjected
to rough or improper handling or stored in an envi-
ronment where moisture, extreme temperatures, or
foreign material can damage the meter.
Flange covers must remain on the meter until it is
ready for installation.
If extended storage is anticipated under harsh fi eld
conditions the meters should be stored in waterproof
lined wooden boxes. Desiccant packs should be taped
to the inside of the meter fl anges to reduce the ef-
fects of humidity on the measuring element. Caution
must be used to insure the desiccant packs are re-
moved prior to installation.
If the meter is removed from service for an extend-
ed period of time it should be fl ushed with a light oil
before being placed into storage. The meter fl anges
should be securely covered.
Installation
WARNING
Compounds used in the making of elastomer gas-
kets, O-Rings and seals will, by nature, deteriorate
over an extended period of time. This is dependent
on elastomer material, frequency of operation and
the product being measured. Extreme caution
should be used when measuring volatile liquids or
when using a meter that has been stored for an
extended period of time. Loss of seal integrity can
result in leakage, damage to the equipment and/or
personal injury.
1.
The BiRotor meter should be mounted on a secure
foundation. Considerations for placement of a right
angle adaptor and meter weight must be made
when vertical installation is required.
2.
Care should be taken to insure that the drain plug
remains accessible. A valve may be installed on
the drain line to facilitate draining of water and
sediment from the meter. A lockable valve is rec-
ommended to reduce the chance of accidentally
draining the meter.
Any product drained from the
meter, either manually or through a centralized
drain system, must be disposed of in accordance
with all local, state, and federal laws.
3.
Skid foundations and process piping must be prop-
erly secured in order to minimize line vibration at
the meter.