
14 December 2010
Due to continued product improvement, Broady’s reserves the right to change product specifications without prior notification.
All Dimension are in mm………….Copyright ©
9
FLUE PENETRATION Vented through Alcove (Single
lined Flue System)
Test Report Number
Date of Report
04/1039
20
th
July 2004
04/1040
20
th
July 2004
04/1041
20
th
July 2004
FLUE PENETRATION Vented through Alcove (Double
lined Flue System)
FLUE PENETRATION Vented through Top Flashing
All external air vents and ceiling penetrations are to
be Vermin and Rodent proof.
Note :
External Requirements
Refer to AS/NZS2918:2001 4.9.1/
NZS5261/5262:2003
Install Flue system to AS/NZS2918:2001/
5261/5262:2003
When using a rubber or Bitumen flashing (Butynol,
Dectite) an Additional Flue pipe Baffle is required.
All external air vents & ceiling penetrations must
be bird proofed with permanently fixed screens.
All flashing to comply with E2.