02 Oct 2020
Broadcom, the pulse logo, Connecting everything, Avago Technologies, Avago, the A logo, Symantec, the Symantec logo, the Checkmark logo, Blue Coat, and the Blue Coat
logo are among the trademarks of Broadcom and/or its affiliates in the United States, certain other countries, and/or the EU. Copyright © 2020 Broadcom. All Rights Reserved.
The term “Broadcom” refers to Broadcom Inc. and/or its subsidiaries. For more information, please visit
www.broadcom.com
.
1 — Unpack the Server
Unpack the shipping package for the server appliance and
verify it includes the following:
Symantec SA-SRVG8-20 or SA-SRVG8-40 server
appliance (Dell PowerEdge R640 XL)
ReadyRails kit with Cable Management Arm (CMA)
Two C14 to C13 power cords
Enterprise Products Safety, Environmental, and
Regulatory Information
document
2 — Rackmount the Server
1. Locate the components for installing the ReadyRails:
Two A10 sliding rails (
1
)v
Two Velcro straps (
2
)
Four screws (
3
)
Four washers (
4
)
2. Install the rack rails, beginning with the left rail:
Fully extend the rear sliding bracket of the rail so that
the rail is as long as possible (
1
).
Position the rail end piece labeled FRONT facing
inward and orient the rear end piece to align with the
holes on the rear rack flanges.
Push the rail straight toward the rear of the rack until
the latch locks into place.
For the front end piece, rotate the latch outward and
pull the rail forward until the pins slide into the flange,
and release the latch to secure the rail in place (
2
).
Repeat the preceding steps to install the right rail.
WARNING!
Before setting up your server appliance, follow the
safety instructions included in the
Safety, Environmental, and
Regulatory Information
document shipped with the server.
WARNING!
To avoid injury, do not attempt to lift the server
by yourself.
CAUTION!
Observe the following cautions before proceeding:
The rack may fall over if allowed to become top-heavy.
Load the rack from the bottom up with the heaviest
components at the bottom.
Take adequate safety and grounding measures to avoid
creating an electrical shock hazard and to prevent bodily
injury.
Use Extended Power Performance (EPP) compliant power
supply units (PSUs), indicated by the EPP label, on your
server. For more information about EPP, see the
Installation
and Service Manual
at
.
NOTE:
The illustrations in this document do not represent a
specific server or system.
NOTE:
The ReadyRails kit is compatible with square,
unthreaded round, and threaded round hole racks.
NOTE:
The documentation set for your server is available at
. Make sure that you always
check this documentation set for all the latest updates.
2
1
3
4
1
2
Security Analytics Gen14 Dell Server Quick Start Guide
SA-SRVG8-20, SA-SRVG8-40