285 Issue 1 - Service Manual - Iceberg
20
9.2 Circulation Pump – Electrical checks
9.2.1 Pump will not operate
•
Check that the pump is switched ON and that the pump is not in an operation delay
period i.e. water contact across Trident probes
•
Check for 240 Volt output to the pump, at the
PUMP-NEUTRAL
and
PUMP-ACTIVE
terminals on the pump.
Neutral
Active
Testing across the two terminals
should read 240 Volts