Brivis 24
Evap AC IM
12.5 BRIVIS AD BLEED SETTING INSTRUCTIONS
•
Loosen the thumb screw, firmly grip the over flow pipe, and rotate it.
•
Move the bleed tray further under the pad to increase the bleed rate or further away from the pad to decrease it�
•
Measure to confirm the required bleed rate and then tighten the thumb screw.
NOTE
Ensure the arrow of the overflow pipe assembly sits between the leg of the locking bracket.
12.6 BRIVIS AD DUMP VALVE FUNCTIONS
The Dump Valve empties the tank after the Cooler is turned OFF, leaving it dry�
When using the Cooler again, refilling the tank will take 4 minutes before Pre-Wet begins. When the Cooler is
turned OFF at the end of use, the Dump Valve will wait 45 minutes before turning OFF the water supply and
draining the tank�
If the Cooler is in continuous operation, the Dump Valve will flush the tank automatically after 35 hours of pump
operation�
NOTE
This is not 35 hours of Cooler operation, but 35 hours of actual pump operation.
NOTE
The entire Start Up sequence, including Pre-Wet could be as long as 8 minutes in some cases, if
the Cooler has been OFF for more than 45 minutes.
12. WATER CONNECTION
Summary of Contents for AD BAL AD56
Page 31: ...Brivis 31 Evap AC IM NOTES ...