![Briteq BT-COLORAY MULTI Operation Manual Download Page 6](http://html1.mh-extra.com/html/briteq/bt-coloray-multi/bt-coloray-multi_operation-manual_2814322006.webp)
ENGLISH
OPERATION MANUAL
BRITEQ
®
4/12
BT-COLORAY MULTI
OVERHEAD RIGGING
Important:
The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials should
be used, the installed device should be inspected regularly for safety.
•
Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
•
Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed
at least 50cm
from surrounding walls.
•
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
•
Bef
ore rigging make sure that the installation area can hold a minimum point load of 10times the device’s
weight.
•
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
•
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
•
Do
n’t cover any ventilation openings as this may result in overheating.
•
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
INSTALLATION OF THE ACCESSORIES
Possible combinations depending on the application