
12
BRIGGSandSTRATTON.COM
Electrical Load Worksheet
Priority
120VAC Electrical Appliances
Priority
240VAC Electrical Appliances
Window Air Conditioner 1
Central Air Conditioner 1
Window Air Conditioner 2
Central Air Conditioner 2
Window Air Conditioner 3
Range/Stove
Refrigerator 1
Dryer
Refrigerator 2
Well Pump
Freezer 1
Hot Tub
Freezer 2
Pool Heater
Microwave
Water Heater
Bathroom
Other:________________________
Auxiliary Heater
Other:________________________
Home Theater System
Other:________________________
Garage Heater
Sink Water Heater
Other:________________________
Other:________________________
Other:________________________
IMPORTANT
: DO NOT connect furnace, sewage pump or sump pump to the power manager.
NOTICE
: Do not connect air conditioning load circuit
wiring to terminal blocks in enclosure labeled LOAD1,
LOAD2, LOAD3 or LOAD4.
Damage to equipment may result.
•
Summary of Contents for Symphony II
Page 1: ...Installation Operator s Manual Manual No 208557GS Rev A 2 6 2009 Power Management System ...
Page 11: ...11 Wiring Decal ...
Page 17: ...Manual de instalación y del operario Sistema de gestión de energía ...
Page 27: ...11 Calcomanía del cableado ...
Page 31: ...Manuel d installation et d utilisation Système de gestion de l alimentation ...
Page 41: ...11 Décalque de câblage ...