
Power Installation completed
7. There will be a sequence of
red
,
blue
&
green
LED lights during the boot-up
process. Once the Boot-up is complete, there will be solid
blue
light. This
means that the power installation is correct.
a. Shortly after, the
green
light will become steady, indicating
connectivity of cellular and power is completed.
8. After the camera has been booted completely, press the G-Sensor
calibration button once (small red button to the left of the panic button.)
The vehicle should be parked on a flat surface when pressing the G-Sensor
Calibrate sensor.
9. There will be a beep and the CP2-LTE LED light will blink briefly to indicate
the G-sensor has registered.
Connecting Secondary Camera
An optional secondary camera can also be added to the CP2-LTE via Channel 2
input. The CP2-LTE is equipped with a simple plug & play connection. Simply
connect the male end connector to the female end input on the CP2-LTE. Then