Volledige bedieningshandleiding 2
© Bredenoord 2017
19
ESaver inform ation
The lower linen shows the software version. The
service engineer needs to pay attention that the
kWh-meters are programmed with the correct
corresponding software from ABB or PANASONIC.
Configurations 1
The values shown above can be set to a desired
value by pressing the number which needs to be set
or changed.
Configurations 2
The start/stop conditions can be adjusted by the
service engineer.
Make sure that the STOP conditons is always lower
than the START condition
The countdown range is set automatically. Only the
minimum and maximum countdown timers need sto
be set.