background image

D. 

VERTICALLY INTO EXISTING MASONRY 
FIREPLACE 

 

NOTE:

 Follow L-Vent chimney manufacturer’s 

instructions. 

 

1.  Have the masonry chimney inspected by a qualified 

chimney sweep or installer to determine its structural 

condition. 

 

2.  You will need a pipe length equal to the chimney 

height from the hearth. If outside combustion air is to 

be used, you will need a pipe length equal to the 

chimney height plus 18 inches. 

 

3.  Install a blanking plate and the chimney pipe, and if 

used the outside air pipe, as shown in Figure 11. 

 

4.  Attach the L-Vent adapter, a section of pipe and 

clean out tee, making sure the clean out tee is 

centered in the chimney flue area. Use RTV, 

metallic tape, and a minimum of three self-taping 

screws at all joint connections to ensure a tight seal. 

 

5.  Position the stove, adhering to the clearances in 

Figures 1 & 2. 

 

6.  Measure and build chimney top plate. Cut out holes 

for chimney pipe, and if used the outside air pipe. 

Install and seal with non-hardening mastic to 

prevent water leakage. Install vent cap. 

 

E. 

INSTALLATION THROUGH SIDE OF MASONRY 
CHIMNEY 

 
NOTE: 

Follow L-Vent chimney manufacturer’s 

instructions. 

 

1.  Position the stove, adhering to the clearances in 

Figures 1 & 2. Mark the center of the hole where the 

pipe is to pierce the masonry chimney. 

 

2.  It will be necessary to break out the masonry around 

the location of the pipe center mark. Use a 4-inch 

diameter hole for 3-inch pipe and 5-inch diameter 

hole for 4-inch pipe. 

 

3.  Measure and build chimney top plate. Cut out holes 

for chimney pipe, and if used the outside air pipe. 

 

4.  Install the tee on the bottom of the vertical pipe 

system and lower it down the chimney until the 

center branch of the tee is level with the center of 

the hole in the masonry, as shown in Figure 12. 

 

5.  Install and seal the top plate from step 3 with non-

hardening mastic. Slip the storm collar over the pipe, 

and while holding the pipe at the proper elevation, 

affix the collar with a minimum of three ¼” stainless 

steel sheet metal screws. Seal all joints and seams 

around the collar. 

 

6.  Connect the horizontal pipe by pushing it through 

the hole in the masonry and lining it up with the 

branch in the tee. Push the pipe into the tee while 

twisting it to lock it into the tee. 

 

7.  If desired, once the horizontal pipe is in place, the 

space between the pipe and masonry may be filled 

with high-temperature grout. 

 

8.  Install the trim collar. An adjustable pipe length and 

adapter may be needed to finish the connection to 

the stove. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 

 

INSTALLATION 

10 

FIGURE 11 

FIGURE 12 

www.PelletKing.com

Summary of Contents for Tradition P24FS

Page 1: ...he installation directions Contact local building or fire officials about restrictions and installation inspection requirements in your area PLEASE read this entire manual before installation and use...

Page 2: ...o approved as a mobile home heater which is designed for connection to an outside combustion air source The stove will not operate using natural draft or without a power source for the blower systems...

Page 3: ...possible this can cause the temperature of the stove to rise to operational levels one of the sensors could then make the stove start on its own It is recommended that the stove be unplugged when not...

Page 4: ...Starting a Warm Stove 16 If Stove Runs Out Of Pellets 17 Damper Control 17 Refueling 17 Breckwell Maintenance Tool 17 Shutdown Procedure 17 Safety Features 17 Optional Thermostat 18 Thermostat Install...

Page 5: ...lation in residential mobile home and alcove applications The P24 Insert is approved for installation into code complying masonry fireplaces The P24 Insert is also approved for use in listed factory b...

Page 6: ...stion air is easily available to the air inlet A closeable outside air register can be used in tightly insulated homes In insert installations flashing vents should not be restricted The flashing shou...

Page 7: ...ve exhaust vent refer to figure 5 3 Always maintain 3 clearance from combustible materials 4 Install L Vent wall thimble per L Vent manufacturer s instructions 5 Attach enough piping to penetrate and...

Page 8: ...L Vent manufacturer s instructions 1 Always maintain 3 clearance from combustible materials When passing through additional floors or ceilings always install firestop spacer 2 After lining up for hole...

Page 9: ...from 3 L Vent to 6 or 8 Class A chimney Figure 10a As an alternative 3 or 4 L Vent can be run inside existing chimney to termination Figure 10b This is the preferred method Follow guidelines for equiv...

Page 10: ...ances in Figures 1 2 Mark the center of the hole where the pipe is to pierce the masonry chimney 2 It will be necessary to break out the masonry around the location of the pipe center mark Use a 4 inc...

Page 11: ...gest painting the interior of particularly old and dirty fireplaces to seal any odors In zero clearance fireplace installations when the fireplace opening is above the floor or raised hearth the adjus...

Page 12: ...onry Fireplaces Only Refer to Figure 15 1 You will need a pipe length that extends 12 above the blanking plate NOTE This installation is optional but not recommended Outside combustion air cannot be d...

Page 13: ...t sides and rear of the stove in fireplace must be enclosed per the applicable electrical standards NOTE Floor protection for Built in raised hearths requires a continuous sheet beneath to prevent the...

Page 14: ...the chimney flue A permanent metal warning label must be attached to the back wall of the fireplace opening stating the following This fireplace has been altered to accommodate a fireplace insert and...

Page 15: ...on the Heat Level Advance setting d RESET TRIM Different size and quality pellet fuel and installation altitude may require adjustment of the 1 feed setting on the Heat Level Advance bar graph This is...

Page 16: ...ckwell approved burnpot NOTE During the first few fires your stove will emit an odor as the high temperature paint cures or becomes seasoned to the metal Maintaining smaller fires will minimize this A...

Page 17: ...r tubes see instructions in CLEANING c Scrape ashes from burnpot SHUTDOWN PROCEDURE Turning your Breckwell stove off is a matter of pressing the On Off control panel switch The green light will go out...

Page 18: ...his owner s manual HIGH LOW THERMOSTAT MODE When engaged in this mode the stove will automatically switch between two settings When warm enough it will switch to the 1 or low setting The room air blow...

Page 19: ...the control panel g KEEP ALL LOOSE OR MOVEABLE HOUSEHOLD COMBUSTIBLES SUCH AS FURNITURE DRAPES TOYS ETC AT LEAST THREE FEET FROM THE OPERATING STOVE h Maintain proper ventilation It is important that...

Page 20: ...r vacuum to remove ashes WARNING Make sure ashes are cool to the touch before using a vacuum See VACUUM USE f Periodically remove and empty ash bin see Figure 24 by unscrewing the two knobs on the fro...

Page 21: ...is highly combustible INSPECT BEHIND THESE CLEANING PLATES AT LEAST ONCE PER TON OF PELLETS BURNED UNTIL YOU ARE FAMILIAR WITH HOW ASHES AND CREOSOTE ACCUMULATE WITH YOUR OPERATING PRACTICES Use the...

Page 22: ...his service It is also recommended that before each heating season the entire system be professionally inspected cleaned and if necessary repaired To clean the chimney detach the vent at the combustio...

Page 23: ...MAINTENANCE 23 FIGURE 29 www PelletKing com...

Page 24: ...ot make sure the slider plate is in place to seal off the firebox floor 4 Vent pipe is incorrectly installed Check to make sure vent pipe installation meets criteria in owner s manual 5 The airflow sw...

Page 25: ...r tube for signs of damage such as burrs rough spots or grooves cut into the metal that could have caused a jam 7 The auger motor has failed Remove the auger motor from the auger shaft and try to run...

Page 26: ...ck the voltage going to the igniter during startup It should be a full current If the voltage is lower than full current check the wiring If the wiring checks out good the board is bad SMOKE SMELL COM...

Page 27: ...ger shaft inspection plate in the hopper so that you can see the auger shaft Gently lift the auger shaft straight up so that the end of the auger shaft comes up out of the bottom auger bushing Next re...

Page 28: ...each setting after the stove has completed the startup cycle Make sure the times match the auger timing chart If the auger motor runs constantly the board is bad 8 Combustion blower is not spinning f...

Page 29: ...nd what setting No other types of fuel have been approved for Breckwell pellet stoves If there are signs of other types of fuel being used advise the consumer to stop using them immediately 4 Power su...

Page 30: ...FIGURE 30 ELECTRICAL DIAGRAM 30 www PelletKing com...

Page 31: ...rol Panel C E 401 Combustion Blower A E 027 Convection Blower A E 033 Door Gasket C G 050 Door Glass C D 030 Exhaust Adapter 3 C M 020 Exhaust Adapter 4 A 4 VA Hot Rod Igniter C E IGN Thermodisk Proof...

Page 32: ...umstances beyond Breckwell s control If warranty service is needed during the warranty period notify the nearest Authorized Breckwell Dealer Provide your name address phone number serial number and mo...

Reviews: