Breckwell ECO-AIRE SP8000 Owner'S Operation And Instruction Manual Download Page 10

10

 

Ussc

When Installing your heater in an exterior wall

•  Select a wall to the exterior of the building.  This wall should 

have the required clearance to combustibles inside and out 

mentioned earlier in this manual.  Make certain that electrical 

wires, conduit, water or gas pipes do not pass through the area 

you have selected 

•  USSC suggest the following installation illustrated to the right, 

however, you may frame the hole cut out to your discretion.  

A sturdy base for the heater to rest should be established.

• 

At the desired height, mark the hole location for your heater.  

Measure and cut the appropriate size hole for your installation.  

The cut out should border a wall stud.  The next wall stud will 

need to be cut.

    Build a frame of 2 x 4’s at the dimensions suggested and secure 

it in place by attaching it to the available studs.

•  Before installing the heater, install the Knee/Support Braces.
•  Install the knee/support braces supplied.  See the previous page for installation. You may use the hardware 

supplied or purchase the appropriate fasteners from your local hardware store for the type of material you 

are securing into.

•  Seal around the heater with silicone or caulking to protect against the weather.

[648mm]

[572mm]

[356mm]

[432mm]

 

WARNING! - DO NOT INSTALL IN A SLEEPING ROOM

 

CAUTION! - THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL, AND CEILING/ROOF MUST BE 

MAINTAINED.

•  The heater must be permanently attached to the wall.  
•  The heater must be electrically grounded to the steel chassis of the mobile home with 8 GA copper wire 

using a serrated or star washer to penetrate paint or protective coating to ensure grounding.

•  When moving your mobile home, the heater must be removed while the mobile home is being relocated.  

After relocation, heater may be reinstalled and securely fastened.

•  Check with your local building officials as other codes may apply.

 

Mobile Home Installation Requirements

Wall Installation

Summary of Contents for ECO-AIRE SP8000

Page 1: ...ully Before Starting The Installation or Operating This Heater ImproperInstallationCouldVoid Your Warranty SAFETY TESTED TO ASTM 1509 04 ULC S 627 00 227 Industrial Park Road P O Box 151 South Pittsbu...

Page 2: ...echnician Turn the heater OFF and allow to completely cool before performing any maintenance Safety Precautions Disconnect the power cord before performing any maintenance NOTE Turning the ON OFF Swit...

Page 3: ...Reason for Purchase qAlternative Heat qMain Heat Source qDecoration qCost qOther_________________________ What was the determining factor for purchasing your new USSC appliance _______ I have read th...

Page 4: ...4 Ussc CUT HERE CUT HERE Fold Here Fold Here United States Stove Company P O Box 151 South Pittsburg TN 37380 Fold Here Place Stamp Here...

Page 5: ...ee of insulation and the outside temperature 3 Pellet size may effect the actual rate of fuel feed and burn times Fuel feed rates may vary by as much as 20 Use PFI listed fuel for best results Electri...

Page 6: ...n of a heater due to improper venting or installation Call 800 750 2723 and or consult a professional installer if you have any questions INSTALL VENT AT CLEARANCES SPECIFIED ABOVE Your Eco Aire heate...

Page 7: ...nches 1 5M General Installation Clearance This unit is approved for Zero Clearance to any installed combustible surface such as the window sash sill or wooden structure in a wall installation However...

Page 8: ...along the knee braces Using a carpenter s level or a straight edge determine the height of the retention bracket in relation to the resting surface of the heater Once you ve determined that mark loca...

Page 9: ...the two sections until the flange on part A meets the inside of the window frame and the flange on part B meets the side of the heater Using a drill with a 5 16 socket bit drive the self tapping scre...

Page 10: ...ater install the Knee Support Braces Install the knee support braces supplied See the previous page for installation You may use the hardware supplied or purchase the appropriate fasteners from your l...

Page 11: ...ON OFF as well as adjustments for the fuel feed rate is performed by pressing the appropriate button s on the control panel which is located on the front lower left hand corner of your heater ON OFF...

Page 12: ...arting the appliance 6 Make sure that the viewing door and combustion door is securely closed the safety switch will not allow the heater to feed fuel if they are left open 7 Press the ON button on th...

Page 13: ...in this unit as indicated can result in poor performance safety hazards and void your warranty Unplug your heater s electrical cord prior to removing the back panel or opening the exhaust system for a...

Page 14: ...of the correct size and thickness DO NOT substitute alternative materials for the glass Contact your authorized dealer to obtain this glass For the glass in the front door bend the two tabs up and rem...

Page 15: ...lid is closed completely Auger system is jammed or there is a bridging of the fuel in the hopper preventing fuel from flowing into the auger feed system PROBLEM CAUSE Auto Start Igniter fails to igni...

Page 16: ...16 Ussc 42 39 40 41 39 LEFT SIDE RIGHT SIDE FILLER PANELS FOAM INSULATOR PANEL CUT TO SIZE 43 Parts Diagram...

Page 17: ...80549 Switch Pressure 1 20 891121 Hose Silicone 1 FT 21 89586 Nipple Auger 1 22 80545 Controller Board Assy 1 23 80555 PWA Display Board 1 24 80550 Keypad Assembly 1 N S 80544 Wiring Harness Main 1 N...

Page 18: ...18 Ussc Wiring Diagram...

Page 19: ...Ussc 19 Notes...

Page 20: ...ve the full model number which is on the nameplate attached to the heater When ordering repair parts always give the following information as shown in this list 1 The part number 2 The part descriptio...

Reviews: