4
ii-B409-DW-10A
EQUIPMENT DRY-FIT
- BEFORE INSTALLING PENETRATION FITTINGS
- BEFORE CUTTING OPEN SUMP INTERSTICE
DRY-FIT YOUR SUMP PIECES AND
INTERNAL EQUIPMENT.
PLAN YOUR INSTALLATION AND MAKE
SURE EVERYTHING FITS, AND WILL FIT
LATER DURING INSTALLATION.
Recommended Tools
(NOT PROVIDED)
Power/air Sanders. Acetone to clean up
tools/applicators. Power Cutting Tools.
- Interstitial fluid
- Standard Manometer
- Manometer Bracket
- Factory-Installed
Nylon tubing
w/20”Hg Vacuum
on interstice
w/Combination
Pressure/Vacuum
Gauge
MANOMETER KIT (PER SUMP)
HYDROSTATIC ONLY!!
TOTAL HEIGHT
4’ = 5 gal
5’ = 6 gal
6’ = 7 gal
7’ = 8 gal
T-F-33-SAND-KIT
5/8” sanding disc backs and
centralizers for all Bravo
Systems Fittings
SVA-BARB
per sump
VAC-KIT-D-AB
per site