Page 14
4500
Cycles
Repeat all previously listed inspection, lubrica
-
tion and maintenance procedures at 750 cycle
intervals.
Consecutive
750 Cycle
Intervals
Inspect vertical arm plastic covers
Inspect power cable
Mounting
Decals and Antiskid
Resecure or replace if needed.
Resecure, repair or replace if needed.
Check to see that the lift is securely anchored to
the vehicle and there are no loose bolts, broken
welds, or stress fractures.
Replace decals if worn, missing or illegible. Re
-
place antiskid if worn or missing.
Maintenance and Lubrication Schedule
continued
Lift
Disposal
Procedure
No lift components contain unacceptable amounts of lead,
cadmium, mercury, or hexavalent chromium.
1. Lower platform to ground.
2. Open pump module manual relief valve.
3. Disconnect power from lift.
4. Capture and recycle hydraulic fluid.
5. Disassemble lift and recycle components.
Refer to exploded views in appropriate service manual.