Page 9
Maintenance and Lubrication Schedule
Maintenance and
lubrication procedures
must be performed as
VSHFLÀHGE\DQ
authorized service
WHFKQLFLDQ)DLOXUHWR
do so may result in
serious bodily injury
and/or property
GDPDJH
WARNING
3URSHUPDLQWHQDQFHLVQHFHVVDU\WRHQVXUHVDIH
trouble free operation. Inspecting the lift for any
ZHDUGDPDJHRURWKHUDEQRUPDOFRQGLWLRQVVKRXOG
be a part of the transit agency daily service program.
Simple inspections can detect potential problems.
The maintenance and lubrication procedures speci-
ÀHGLQWKHIROORZLQJVFKHGXOHPXVWEHSHUIRUPHG
by a Braun authorized service representative at
the scheduled intervals according to the number of
cycles.
All service procedures must be performed
when the lift is fully on the ground.
1/6HULHV
lifts are equipped with a cycle counter (digital display
built into the electronic control board).
1/6HULHVOLIWVDUHHTXLSSHGZLWKKDUGHQHGSLQV
DQGVHOIOXEULFDWLQJEXVKLQJVWRGHFUHDVHZHDU
provide smooth operation and extend the service life
of the lift.
:KHQVHUYLFLQJWKHOLIWDWWKHUHFRPPHQGHGLQWHUYDOV
LQVSHFWLRQDQGOXEULFDWLRQSURFHGXUHVVSHFLÀHGLQWKH
previous sections should be repeated. Clean com-
ponents and the surrounding area before applying
OXEULFDQWV&OHDQRQO\ZLWKZDWHUDQGZKHQFOHDQHG
lubricate as directed in the lubrication diagram. Do
not use solvents to clean. LPS2 General Purpose
Penetrating Oil is recommended where Light Oil is
called out. Use of improper lubricants can attract
dirt or other contaminants which could result in wear
or damage to the components. Platform compo-
nents exposed to contaminants when lowered to the
ground may require extra attention.
Lift components requiring
grease are lubricated dur-
ing assembly procedures.
:KHQUHSODFLQJWKHVH
FRPSRQHQWVEHVXUH
to apply grease during
installation procedures.
6SHFLÀHGOXEULFDQWVDUH
available from The Braun
Corporation (part num-
bers provided on previ-
ous page).
$OOOLVWHGLQVSHFWLRQOXEUL
-
cation and maintenance
procedures should be
repeated at 750 cycle intervals following the scheduled
4500 cycle maintenance procedures. These intervals
are a general guideline for scheduling maintenance
procedures and will vary according to lift use and condi-
WLRQV/LIWVH[SRVHGWRVHYHUHFRQGLWLRQVZHDWKHUHQYL
-
URQPHQWFRQWDPLQDWLRQKHDY\XVDJHHWFPD\UHTXLUH
inspection and maintenance procedures to be performed
PRUHRIWHQWKDQVSHFLÀHG
Discontinue lift use immediately if maintenance and
OXEULFDWLRQSURFHGXUHVDUHQRWSURSHUO\SHUIRUPHGRULI
WKHUHLVDQ\VLJQRIZHDUGDPDJHRULPSURSHURSHUDWLRQ
Contact your sales representative or call The Braun Cor-
poration. One of our national Product Support represen-
tatives will direct you to an authorized service technician
who will inspect your lift.
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil to both sides of slot.
See Lubrication diagram
Apply Apply Synthetic Grease to both sides of slot.
See Lubrication diagram
Correct or replace damaged parts.
Correct or replace damaged parts and/or relubri-
cate. See Lubrication Diagram
6HH&HUWLÀFDWLRQ&KHFNOLVW'LDJQRVWLF3URFHGXUHV
Correct as needed.
Correct as needed.
Extend outer platform and use compressed air to
remove any debris in the platform slide plate tracks.
750
Cycles
Outer barrier pivot bearings (2)
Outer barrier latch pivot (2)
Outer barrier latch split foot pivot
Outer barrier bracket slot (both sides) - (2)
Inspect outer barrier for proper operation
,QVSHFWRXWHUEDUULHUODWFKIRUSURSHURSHUDWLRQ
SRVLWLYHVHFXUHPHQWDQGGHWDFKHGRUPLVVLQJ
spring
9HULI\)0966&HUWLÀFDWLRQ&KHFNOLVW
,QVSHFWOLIWIRUZHDUGDPDJHRUDQ\DEQRUPDO
condition
Inspect lift for rattles
Platform slide tracks (6)