Page 11
Maintenance and Lubrication Schedule
5HSHDWDOOSUHYLRXVO\OLVWHGLQVSHFWLRQOXEULFD
-
tion and maintenance procedures at 750 cycle
intervals.
Consecutive
750 Cycle
Intervals
4500
Cycles
Resecure or replace if needed.
Use Braun 32840-QT (Exxon
®
Univis HVI 26)
K\GUDXOLFÁXLGGRQRWPL[ZLWK'H[WURQ,,,RURWKHU
K\GUDXOLFÁXLGV&KHFNÁXLGOHYHOZLWKSODWIRUP
lowered fully and roll stop unfolded fully. Measure
IURPWKHWRSRIWKHÀOOWXEHWRORFDWHÁXLGOHYHO
7LJKWHQUHSDLURUUHSODFHLIQHHGHG
Replace if needed.
Tighten or replace if needed.
Replace damaged parts and resecure as needed.
Apply Synthetic Grease during reassembly proce-
dures.
7LJKWHQUHSODFHRUFRUUHFWDVQHHGHG
Apply light oil or replace as needed. See Lubrica-
tion Diagram.
5HVHFXUHUHSDLURUUHSODFHLIQHHGHG
Check to see that the lift is securely anchored to
WKHYHKLFOHDQGWKHUHDUHQRORRVHEROWVEURNHQ
ZHOGVRUVWUHVVIUDFWXUHV
5HSODFHGHFDOVLIZRUQPLVVLQJRULOOHJLEOH
Inspect cotter pins:
8SSHULQQHUFRQWURODUPV
2XWHUEDUULHUODWFKJDVVSULQJVKDLUSLQ
6SULQJWHQVLRQHUSXOOH\EUDFNHW
/HDIFKDLQPRXQWLQJSLQV
+\GUDXOLF)OXLG3XPS&KHFNOHYHO1RWH)OXLG
should be changed if there is visible contamination.
,QVSHFWWKHK\GUDXOLFV\VWHPF\OLQGHUKRVHVÀW
-
WLQJVVHDOVHWFIRUOHDNVLIÁXLGOHYHOLVORZ
,QVSHFWF\OLQGHUVÀWWLQJVDQGK\GUDXOLFFRQQHFWLRQV
IRUZHDUGDPDJHRUOHDNV
,QVSHFWYHUWLFDOFKDQQHOVEHDULQJVDQGSLYRWSLQV
for visible wear or damage
Inspect inner / outer vertical channel roller mount-
ing bolts (72)
,QVSHFWSODWIRUPSLYRWSLQEHDULQJVDQGYHUWL
-
FDOFKDQQHOVIRUZHDUGDPDJHDQGSRVLWLYH
securement
Inspect gas springs (cylinders - 4) for wear or dam-
DJHSURSHURSHUDWLRQDQGSRVLWLYHVHFXUHPHQW
Inspect intermediate vertical channel (I-beam)
chain roller bearing (2)
Inspect power cables
Mounting
Decals
3HUIRUPDOOSURFHGXUHVOLVWHGLQSUHYLRXVVHFWLRQDOVR