Page 11
Lift Installation
Position Lift
90°
Minimum
12 mm
Clearance
Minimum
12 mm
Clearance
Figure D
Except when
wedges are
used.
Alignment:
Side-to-Side Alignment: See Figure B on
previous page. The lift vertical arms and
platform should be perpendicular (90°) to the
vehicle floor and parallel (aligned) with the ver
-
tical sides of door jamb. The vertical arms and
the parallel arms must clear the door opening
when the lift folds and unfolds.
Inboard-to-Outboard Alignment: See Figure
D. The vertical arms and parallel arms must be
aligned and parallel to each other. See Figure
D. The lift towers should be perpendicular
(90°) to the vehicle floor (except when base
plate wedges are used).
Step well Installations: It is not permissible
for the base plate to overhang the step well.
Base plate support must be constructed in the
step well for lift support. The structure must be
level with the existing floor and of equivalent
construction (structural strength).
Lift-Tite
®
Latches: When checking
vehicle wall clearance - allow the lift to
drift fully into the Lift-Tite
®
latches to
ensure proper clearances.
Figure F
Figure E
AI/CL917/007
Base Plate
Wedges
Mounting Bolts
(Typical)
Base Plate Wedges: The top of the lift may
need to be tilted inboard slightly to provide the
minimum 12mm clearance. Position wedges
as shown in Figure E.
Install wedges to increase platform and verti-
cal arm clearance between lift and vehicle.
Lift-Tite
®
Latch
Engagement
Pin
Summary of Contents for L952SE2740IB-2
Page 44: ...Page 42...