background image

Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 32494

Lift Operating Instructions

T

R

Q

Manual Operating Instructions

If you experience power or equip-

ment failure, refer to the Manual 

Operating Instructions to operate 

the lift.  Instructions and photos 

are provided for all steps that 

differ from standard lift operation 

procedures.  Manual Instructions 

Decal 31894 (posted on pump 

cover) provides manual operat-

ing instructions also.  Refer to the 

Release Valve

maximum

30 inch lbs

minimum

15 inch lbs

seats

(stops)

OP

EN

CL

O

SE

approximate

1/16” intervals

Valve Tightening

Specification:

Once valve seats 

(stops), tighten 15 

to 30 inch pounds 

as shown.

Release Valve

Note:

  Close backup 

pump release valve 

securely

before

 operating 

electric pump.

A

C

B

T

o Unfold Platform (Out):

Using hand pump handle:

a. Place slotted end of pump handle onto 

back-up pump release valve and turn 

counterclockwise

 (open — 

1/2 turn 

only

) until the platform reaches 

floor 

level

 (

fully

 unfolded).  See Photo B.

b. Turn the release valve 

clockwise

(close) to stop the platform.  See Photo 

B.

Note:

Valve must be tight, but 

do not

overtighten.

DOWN

 (

T

o Lower Platform and Unfold 

Outer Barrier):

Place slotted end of pump handle onto 

back-up pump release valve and turn 

counterclockwise

 (open — 

1/2 turn only

)

until the platform reaches ground level 

and/or outer barrier unfolds.  See Photo B.

UP

 (

T

o Fold Outer Barrier and

Raise Platform): 

Using hand pump handle:

a. Place slotted end of pump handle 

onto back-up pump release valve 

and turn 

clockwise

 to close secure-

ly.  See Photo B.

Note:

Valve must be tight, but 

do

not

 overtighten.

b. Insert handle into back-up pump and 

stroke until platform reaches 

floor 

level

(see Photo C).

T

o Fold Platform (In):

Insert handle into back-up pump and 

stroke until platform 

stops

 (folds 

fully

).

See Photo C.

Note:

  Close back-up pump release 

valve securely 

before

 operating elec-

tric pump.

S

U

Lift Operating Instructions for all 

normal lift operation procedures 

(such as loading and unloading 

passengers).

Follow all Lift 

Operation Safety Precautions!

  

T

o Load Passenger 

(continued)

:

3.

 Unlock wheelchair brakes and load 

passenger from platform into ve-

hicle.

Note:

  Lower head to clear 

door jamb header.

T

o Fold Platform (In):

Press FOLD (orange IN) switch 

until platform 

stops

 (fully folded).

Release switch. 

T

o Close Door(s):

Automatic Door Operator(s):

Press yellow CLOSE switch until 

door(s) are 

fully closed

.  Release 

switch.

Manual Door(s):

Manually close door(s) 

fully

.

Open

(Down)

Close

(Up/Stop)

Summary of Contents for FMVSS No. 403

Page 1: ...s Installation Kits 30959K 30981K Rear Bumper Replacement Kit 19395A96 required DOT Private Use Lift NHTSA Vehicle Physical Requirements B A C Figure A Door Opening Dimensions Vehicle lift access door...

Page 2: ...ssis 1 Drill 1 1 8 diameter grommet access hole Check under the vehicle for obstructions 2 Insert grommet Secure grommet with two self tap screws 3 Route ground and power cables through grommet Route...

Page 3: ...Install 31798A in cavity 7 or 9 Shipped As VEHICLE SECURE SIGNAL Grey Red LIFT STOWED SIGNAL Yellow Light Blue PUMP MODULE CONNECTOR J21 6 5 4 3 2 1 SIGNAL DEFINITION NO 9 COND WIRE CODE 7 VEHICLE SE...

Page 4: ...tform at desired oor level position passenger loading unloading height Note Position platform such that a the inner roll stop is laying at on the threshold plate b platforrm has not begun to fold 2 Tu...

Page 5: ...2 Press red DOWN switch until the entire platform reaches ground level stops and outer barrier unfolds fully see Photos H and I Release switch Switch Arm Switch Slide knob in to DOWN position See Pho...

Page 6: ...r Platform and Unfold Outer Barrier Place slotted end of pump handle onto back up pump release valve and turn counterclockwise open 1 2 turn only until the platform reaches ground level and or outer b...

Page 7: ...nents Platform compo nents exposed to contaminants when lowered to the ground may require extra attention Lift components requiring grease are lubricated dur ing assembly procedures When these compone...

Page 8: ...ting pivot slide arm UHMW slide bear ings buttons Inspect vertical arm plastic covers Inspect power cable Mounting Decals and Antiskid Maintenance and Lubrication Schedule Perform all procedures liste...

Reviews: