
3
INSTALLATION INSTRUCTIONS _______________________________________________
1. Unpack and remove unit from shipping carton and pallet.
2. Inspect the unit for any visible damage.
3. Make sure the installation location is free from explosion or fire hazard and is a suitably ventilated;
otherwise, ventilate the area periodically during use of the equipment.
4. Make sure the plumbing from the air compressor to the Nitrogen Generator is made of an appropriately
rated copper, steel or aluminum and is at least 30 ft. in length.
5. Install on a solid level wall.
6. Anchor the unit to the wall with 3/8 anchor bolts (not supplied) utilizing the four mounting tab holes on the
back of the unit.
7. Connect the
air
supply line to the inlet on the side of the unit.
8. Connect the
nitrogen
supply line to the deoxygenated air outlet on the side of the unit.
NOTE:
The Nitrogen generator has a filter system that captures oil, water and other contaminants. However, if your
air supply system generates an excessive amount of water, etc., it may be desirable to install an air dryer.
NOTICE:
The presence of any oil in the Nitrogen Membrane will void the
manufacturer’s warranty.
OPERATING INSTRUCTIONS _________________________________________________
1.
Slowly
rotate valve lever on the front of the unit, from the “OFF” position to the “ON” position.
2. Nitrogen is now being produced and vehicle tires can then be filled or a N
2
storage tank can be filled.
3. To sample the nitrogen purity the nitrogen generator is producing, use the optional nitrogen analyzer and
check it at the sampling port (front panel, above the ON/OFF valve) just as you would check a nitrogen
filled tire.
4. When not in use,
Slowly
rotate valve lever on the front of the unit, from the “ON” position to the “OFF”
position.