Installation
SN2003/AST4, SN2003/AST4-F, SN2023/AST4
Bradley
• 215-1072 Rev. L: ECO 20-00-015
8/24/2020
5
A
Remove Access panel and with
the help of another person, place
unit in position against wall .
Rough-in of plumbing lines and wall braces must be
completed before unit can be properly installed.
C
Install suitable wall anchors (supplied
by installer) for 3/8" bolts at the marked
locations . Secure unit to wall .
Water Supply Gang
Valve Assembly
B
Ensure unit is level, shimming floor unit if
necessary . Mark the wall anchor locations .
Water Supply Gang
Valve Assembly
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Hot Supply Inlet
Cold Supply Inlet
Navigator TMV
Braided
Hose
OPTIONAL
Tempered
Line Adapter
Assembly
(S39-804)
Stop Valve
A
Connect stops to hot and cold water supply .
Connect one end of each supply hose to a
stop and the other end to the hot and cold
inlets of the Navigator
®
TMV .
B
OPTIONAL TEMPERED LINE CONNECTION: Connect one
end of the supply hose to the stop and the other end to the
tempered line adapter in the gang valve assembly .
1
Install Unit
2
Connect Water Supply to Valve Assembly
STOP!!! If installing optional Shroud/Slip Ring or Towel Dispensers,
complete those installations before proceeding to Step 3 (see page 7).