background image

2

S19-430EFW

Installation

6/28/06

Bradley Corporation • 215-1164 Rev. L; EN 06-515

Pre-Installation Information

Operation

Water flows when the handle on the valve is squeezed and remains open while squeezed.

Components

Sprayhead: 

Perforated sprayhead provides soft spray for cleansing eyes and face. The integral flow

control assures safe, steady flow under varying water supply conditions from 30-90 PSI. 

NOTE: The

ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI flow
pressure.

Drench Hose: 

The 8' (2.4 m) hose has a 3/8" IPS male thread with a removable 1/2" x 3/8" female

reducing coupling.

Supplies Required

• 1/2" IPS water supply piping
• #10 screw to mount hose holder (anchor optional)
• Backflow prevention device as required by UPC, IPC and/or local plumbing codes

WARNING

Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the
installer.

Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin
installation until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to
the eyewash should be “ON” at all times. Provisions shall be made to prevent
unauthorized shutoff. Flushing fluid should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to
ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should
be trained regarding the placement and proper operation of emergency
equipment per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit
www.bradleycorp.com or call 1-800-BRADLEY. 

Product warranties may also be found under ”Product Information” on our web
site at www.bradleycorp.com.

Installation

TH

IS

SID

E

UP

Packing List




P

.O

. B

ox

 3

09

, M

en

om

on

ee

 F

alls

, W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Tes

t-operate valve

(s) each w

eek and sign below

.

R

eport any m

alfunctions im

m

ediately.

V

entil(e) w

öchentlich im

 Testbetrieb prüfen, bestätig

durch U

nte

rschrift. Jegliche Störung sofort m

elden. 

Date

Datum

Date

Signed

Unterschrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

Ä

1S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Test le fonctionnem

ent des valves chaque sem

aine et 

signe en bas. S

'il y à quelque c

ho

se qui ne

 va pas fait  

un rapport im

m

édiatem

ent. 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-430EFW

Page 1: ...yau mobile avec support boyau Manguera rociadora de mano con portamanguera Table of Contents Pre Installation Information 2 Installation Instructions 3 Parts List 3 Assembly of Components 3 4 Table de...

Page 2: ...Test the unit for leaks and adequate water flow Main water supply to the eyewash should be ON at all times Provisions shall be made to prevent unauthorized shutoff Flushing fluid should be tepid per A...

Page 3: ...tlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR...

Page 4: ...Installation Instructions for Hose Holder 4 S19 430EFW Installation 6 28 06 Bradley Corporation 215 1164 Rev L EN 06 515...

Page 5: ...ant et apres l installation Assurez vous que le d bit d eau est ad quat et qu il n y a pas de fuites L alimentation principale en eau doit tre toujours OUVERTE On devra pr voir des dispositions pour e...

Page 6: ...ediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER...

Page 7: ...lation S19 430EFW Bradley Corporation 215 1164 Rev L EN 06 515 6 28 06 MONTAGE SUR TUYAU SUPPORT BOULON EN U INSTALLER AU DESSUS DU T VIS ET ANCRAGES NON FOURNIS MONTAGE MURAL MUR Liste des pi ces Tuy...

Page 8: ...del suministro de agua antes y despu s de la instalaci n Verificar que no haya fugas y que el flujo de agua sea adecuado El suministro principal de agua a la unidad debe estar siempre en posici n ON...

Page 9: ...ort any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed...

Page 10: ...06 515 Instrucciones de instalaci n con portamanguera MONTAJE EN LA TUBERIA SOPORTE PERNO EN U MONTAR SOBRE LA T DE TUBERIA TORNILLOS Y ANCLAS SUMINISTRADOS POR EL INSTALADOR MONTAJE EN LA PARED PARED...

Reviews: