background image

2

S19-310PVC

 

Installation

8/11/09 

Bradley Corporation • 

215-1134 Rev. T; ECM 09-05-0019

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 
proper operation. This equipment should be inspected annually to ensure compliance 
with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per ANSI 
Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-310PVC

Page 1: ...Combin douche oculaire faciale Combinaci n de ducha de aspersi n y lavador de ojos rostro Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts Li...

Page 2: ...proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the...

Page 3: ...pipe joints The bottom edge of the showerhead should be 84 2134mm from the floor 4 Connect the water supply piping to the 2 PVC inlet on the unit piping by installer Provide adequate supports supplied...

Page 4: ...and sign below Report any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date...

Page 5: ...2 128 142 1 Handle 8 269 1109 1 1 PVC 90 Elbow 9 113 942 1 1 PVC Pipe x Closed Nipple 10 113 944 1 1 PVC Pipe x 8 Long 11 113 945 1 1 PVC Pipe x 12 Long 12 153 333 1 Pipe Plug 13 269 874 1 Cap Plug Ey...

Page 6: ...dates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereus...

Page 7: ...8 Appliquez de la p te ou du ruban d tanch it PVC ou ruban au t flon non fourni sur tous les filetages m les Le bord inf rieur de la pomme de la douche d urgence doit se trouver 84 2134mm du sol 4 Ra...

Page 8: ...k and sign below Report any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Da...

Page 9: ...ment 7 2 128 142 1 Levier de la vanne 8 269 1109 1 Coude PVC 1 90 9 113 942 1 Tuyau PVC 1 raccord ferm 10 113 944 1 Tuyau PVC 1 x 8 11 113 945 1 Tuyau PVC 1 x 12 12 153 333 1 Bouchon 13 269 874 1 Bouc...

Page 10: ...be inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que...

Page 11: ...en la p gina 12 Aplicar sellador de PVC de tuber a o cinta de tefl n suministrada por el instalador a todas las juntas de tuber a de rosca macho El borde inferior del cabezal rociador debe quedar a 8...

Page 12: ...Report any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Sign...

Page 13: ...Tubo de PVC de 1 x empalme cerrado 10 113 944 1 Tubo de PVC de 1 x 8 11 113 945 1 Tubo de PVC de 1 x 12 12 153 333 1 Tap n de tuber a 13 269 874 1 Tap n Lavaojos 14 S90 008 1 Conjunto de tubos de la v...

Reviews: