background image

6

S19-310

 Installation

4/8/2019 

Bradley • 

215-163 Rev. J; ECO 19-05-003

Parts List

Prepack S45-122 includes items 21, 21.1, 24, 25

Prepack S45-123 includes items 21.1, 24, 25

Item

Part No.

Qty.

Description

1

131-059

1

Base

2

169-727

3

Pipe Tee 1¼" NPT

3

113-006LW

2

Pipe 1¼" NPT x 22½"

4

S06-136

1

Pipe Solid 1¼" NPT x 3"

5

169-841

1

Reducing Tee 1¼" x 1¼" x ½"

6

113-006LC

1

Pipe 1¼" NPT x 27½"

7

169-722

1

Reducing Tee 1¼" x 1¼" x 1"

8

169-724

1

Pipe Plug 1¼" NPT

9

113-006LL

1

Pipe 1" NPT x 9"

10

S30-059

1

Stay-Open Ball Valve 

Assembly 1" NPT

10.2

128-201

1

Handle

10.3

S27-278

1

1" Ball Valve with Jam Nut

10.31 110-214

1

Jam Nut only

10.4

124-048

1

Washer, Friction

10.5

153-489

1

Adapter

11

113-006LK

1

Pipe 1" NPT x 12"

12

169-847

1

90° Elbow 1" NPT

13

151-001

2

Curtain Hook

14

S24-188

1

Showerhead Assembly

15

128-156A

1

Pull Rod - 25½" Long

16

269-915

1

Grip Pad (not shown)

Item

Part No.

Qty.

Description

17

169-025

2

Elbow ½" NPT

18

169-726

1

Union ½" Female NPT

19

113-006QX

1

Pipe 1¼" NPT x 73⁄32"

20

113-006LQ

3

Pipe ½" NPT x 3½"

21

S27-282

1

½" Ball Valve with Jam Nut

21.1

110-215

1

Jam Nut only

22

169-764

1

90° Pipe Elbow 1¼" NPT

23

113-006LE

1

Pipe Nipple 1¼" NPT x 3"

24

128-135

1

Handle

25

142-002DA

1

Lockwasher

26

S90-284

1

Std. Plastic Bowl Assy.

26.1

111-039

1

Inlet Drain Fitting

26.2

124-028

1

Center Seal Gasket

26.3

154-058

1

Plastic Bowl

26.4

173-025

1

Cup Strainer

26.5

S21-071

1

Supply Pipe Assy.

26.6  113-1185

1

Spacer, Drain

26.7

S05-091

1

Eyewash Yoke

26.8

107-371

2

Tethered Dust Cover

27

114-052

1

Safety Sign

28

204-421

1

Emergency Inspection Tag

Summary of Contents for S19-310

Page 1: ...es de comenzar la instalaci n Guarde estas instrucciones y cons ltelas para obtener informaci n sobre la inspecci n el mantenimiento y la soluci n de problemas For questions regarding the operation in...

Page 2: ...ts List 6 Table des mati res Avant l installation 7 Equipements n cessaires 8 Fixation de la bride au sol 8 Assemblage des composantes 8 Raccordement de l alimentation en eau 8 Assemblage des composan...

Page 3: ...ed emergency fixtures require a minimum of 30 psi flowing pressure in order to function as designed and meet the ANSI ISEA Z358 1 standard Before installation make sure that this equipment will meet t...

Page 4: ...e supplied by the contractor or purchased from Bradley Corporation Secure base to floor 1 Install three suitable anchors supplied by installer for 3 8 bolts in the floor 2 Bolt the base to the floor a...

Page 5: ...t Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pa...

Page 6: ...11 113 006LK 1 Pipe 1 NPT x 12 12 169 847 1 90 Elbow 1 NPT 13 151 001 2 Curtain Hook 14 S24 188 1 Showerhead Assembly 15 128 156A 1 Pull Rod 25 Long 16 269 915 1 Grip Pad not shown Item Part No Qty De...

Page 7: ...Bradley raccord de plomberie exigent une pression d coulement d au moins 30 lb po2 pour fonctionner tel que calcul et se conformer la norme ANSI ISEA Z358 1 S assurer avant l installation que cet qui...

Page 8: ...e 3 8 non fournies Assemblage des composantes 1 Assemblez d abord la douche d urgence puis la douche oculaire voir page 8 2 Pour faciliter l installation d brancher l union 18 avant l assemblage 3 Met...

Page 9: ...Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm...

Page 10: ...PT x 12 12 169 847 1 Coude 90 de 1 NPT 13 151 001 2 Crochet 14 S24 188 1 T te de douche 15 128 156A 1 Tige 25 16 269 915 1 Tampon anti d rapant non montr Pi ce R f Qt Description 17 169 025 2 Coude NP...

Page 11: ...emergencia con tuber as de Bradley requieren una presi n de flujo m nima de 2 1 bar 30 psi para que funcionen seg n fueron dise ados y cumplan con la norma ANSI ISEA Z358 1 Antes de la instalaci n ase...

Page 12: ...omponentes 1 Montar primero los componentes de la ducha de alto flujo y luego montar los componentes del mecanismo para el lavado de los ojos p gina 12 2 Para facilitar el ensamblaje desconecte la uni...

Page 13: ...igned DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 27 28...

Page 14: ...1 Conjunto de cabezal rociador 15 128 156A 1 Varilla de tiro 25 16 269 915 1 Almohadilla de agarre preempaquetada 17 169 025 2 Codo NPT de 18 169 726 1 Uni n NPT hembra de Art Pieza N Cant Descripci...

Reviews: