background image

2

S19-260

 Installation

10/22/2012 

Bradley฀•฀

215-770 Rev. L; ECN 12-05-003C

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it with the 

owner or maintenance department. Compliance and conformity to drain requirements and 
other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding 

any packaging material. If any parts are missing, do not begin installation until you obtain 
the missing parts.

Flush the water supply lines before beginning installation and after installation is complete. 

Test the unit for leaks and adequate water flow. Main water supply to the eye/face wash 
should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.

The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley 

plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. 
Flushing fluid should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 

proper operation. This equipment should be inspected annually to ensure compliance with 
ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained 

regarding the placement and proper operation of emergency equipment per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.bradleycorp.

com or call 1-800-BRADLEY. 

Product warranties may also be found under “Products” on our web site at 

www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List

P.O

. Bo

x 309,

 Menomonee F

alls,

 WI 53051

R

TEST 

THIS 

UNIT EA

CH 

WEEK

Test-operate v

alv

e(s) eac

h week and sign 

belo

w.

Repor

t an

y malfunctions immediatel

y.

Ventil(e) w

öc

hentlic

h im 

Testbetrieb prüf

en,

 bestätigt 

dur

ch Unter

sc

hrift.

 Jeglic

he Störung sof

or

t melden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

DIESES GERÄ

T 1ST 

W

ÖC

HENTLICH ZU 

PR

ÜFEN.

ESSAI HEBDOMA

DAIRE

Test le f

onctionnement des v

alves

 c

haque semaine et 

signe en bas.

 S'il y à quelqu

ch

ose qui ne v

a pas fait  

un rappor

t immédiatement.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-260

Page 1: ...le de comptoir encastrée Accesorio para el lavado de los ojos rostro con montaje de platforma Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 4 Table des matières Avant l installation 5 Instructions d installation 6 Assemblage des composantes 7 Liste des pièces 7 Contenido Información previa a la instalación 8 Instrucciones de instal...

Page 2: ...e recorded weekly to verify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or cal...

Page 3: ...yewash IMPORTANT To ensure proper operation the handle assembly should be in the up position while the ball valve is closed To make the adjustment rotate the handle assembly 180 and reattach to the ball valve 1 Assemble the valve and pipe as shown on page 4 and connect it to the bowl 2 Lower the complete assembly through the cutout and secure it to the deck with the mounting hardware provided 3 At...

Page 4: ...t signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 051 1 1 3 6 4 4 1 7 1 2 1 3 1 4 5 1 5 2 1 2 1 2 2 2 3 8 1 Drain Outlet NPT Supply Inlet Item Part No Qty Description 1 S90 098 1 Stainless Steel Bowl Assembly 1 1 111 039 1 Inlet Drain Fitting 1 2 124 024 1 C...

Page 5: ...tionement Notez les dates d inspection Ce matériel doit être inspecté une fois par an pour assurer sa conformité à la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des matières potentiellement dangereuses doivent recevoir une formation sur la mise en place et le bon fonctionnement du matériel d urgence conformément à la norme ANSI Z358 1 Pour toute question concernant le fon...

Page 6: ...culaire et découpez l ouverture dans le comptoir Étape 2 Pose de la douche oculaire IMPORTANT Pour assurer un bon fonctionnement l ensemble de poignée doit être en position up vers le haut pendant que le robinet est fermé Pour ajuster faire tourner l ensemble de poignée de 180 et rattacher au robinet 1 Assemblez le robinet et le tuyau sur page 7 et les raccorder au récepteur 2 Posez l ensemble dan...

Page 7: ... pas fait un rapport immédiatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 051 1 1 3 6 4 4 1 7 1 2 1 3 1 4 5 1 5 2 1 2 1 2 2 2 3 8 Alimentation NPT Orifice de vidange 1 NPT Pièce Réf Qté Description 1 S90 098 1 Assemblage du récepteur en acier inox 1 1 111 039 1 Raccordement d entrée du drain 1 2 124 024 1 Joint central 1 3 187 ...

Page 8: ...358 1 Este equipo se debe inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que puedan tener contacto con materiales potencialmente peligrosos deben recibir capacitación sobre la ubicación y operación adecuada de los equipos de emergencia en conformidad co...

Page 9: ... garantizar el funcionamiento correcto el conjunto de manilla debe estar en posición vertical mientras la válvula de bolas esté cerrada Para realizar el ajuste gire el conjunto de manilla en 180 y vuelva a fijarlo a la válvula de bolas 1 Montar la válvula y el tubo como se muestra en la página 10 y conectar al conjunto del receptor 2 Bajar el conjunto completo a través del agujero y afianzarlo al ...

Page 10: ...ALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 051 1 1 3 6 4 4 1 7 1 2 1 3 1 4 5 1 5 2 1 2 1 2 2 2 3 8 Entrada de suministro NPT Salida de drenado 1 NPT Art N de pza Ctd Descripción 1 S90 098 1 Conj del receptor de acero inoxidable 1 1 111 039 1 Conexión de la entrada del desagüe 1 2 124 024 1 Junta del sello central 1 3 187 054 1 Receptor de acero inoxidabl...

Reviews: