LD-3010 Series
Installation
10
2/27/2020
Bradley
• 215-1219 Rev. Q: ECO 19-08-037B
2
OmniDeck™ Mounting
Secure the carrier
sleeves to the bottom
of the lav deck at the
desired locations with
silicone caulk/sealant .
B
With help, slide the lav deck
onto the carrier, aligning the
access holes in the carrier
sleeves with the carrier arm
leveling screws and locking
device . Adjust the carrier
sleeves as needed .
C
Leveling
Screws
Locking
Device
Carrier
Sleeve
FinishedFloor
Carrier
Sleeve
6" (152)
9"
(229)
6" (152)
Install the concealed
arm lav carrier
(supplied by installer)
per manufacturer's
instructions .
A
Bottom View of Lav Deck
with Carrier Sleeves
Apply PC-Concrete
®
injectable
repair and anchoring epoxy (or
equal) to the top of the mounting
strips (left-hand bracket shown) .
A
Carrier Sleeve Mounting
Bracket Mounting
Leveling Screw
Access Hole
Locking Device
Access Hole
Leveling Screw
Access Hole
Position the access panels
snug to the underside of the
basin . Secure the access
panels to the wall with four
#10 fasteners (supplied by
installer) .
B
Terreon SL-TO1 oval bowl is shown.
All other bowls are similar.
SL-TR1 rectangular bowl is shown, all other
bowls are similar.
Backing substrate required for structural
integrity if brackets aren't secured to a stud.
Table A
Basin Model #
Carrier Arm Spacing
(min.)
SL-TO1
22" (559)
SL-TR1
23" (584)
HS-TO1
27½" (699)
HS-TS1
19" (483)
HS-TR1
27½" (699)
See Table A